Nuclear Power Plants in Pakistan
Chasnupp-1
Location: Pakistan
Operator: Pakistan Atomic Energy Commission
Configuration: 1 X 325 MW PWR
Operation: 2000
Reactor supplier: China National Nuclear Corp
T/G supplier: Shanghai
EPC: Ministry of Nuclear Industry, Shanghai Nuclear Engineering Research and Design Institute
Quick facts: This was China's first export reactor project. Construction started in Aug 1993 and operations began in Sep 2000. The site is on the Indus River.

Photograph courtesy of Pakistan AEC
Posted 24 Jan 2006

Chasnupp-2
Location: Pakistan
Operator: Pakistan Atomic Energy Commission
Configuration: 1 X 325 MW PWR
Operation: 2011
Reactor supplier: China National Nuclear Corp
T/G supplier: Shanghai
EPC: Ministry of Nuclear Industry, China Zhongyuan Engineering Corp
Quick facts: This is a sister unit to Chasnupp-1. The contract was signed in May 2004, ground-breaking was on 8 Apr 2005, and first concrete was on 28 Dec 2005. Chasnupp-2 was connected to the grid on 14 Mar 2011 and declared commercial on 12 May 2012.

Photograph courtesy of China Zhongyuan Engineering Corp
Posted 9 Mar 2011

Kanupp
Location: Pakistan
Operator: Pakistan Atomic Energy Commission
Configuration: 1 X 137 MW PHWR
Operation: 1972
Reactor supplier: Canadian General Electric
T/G supplier: Hitachi
EPC: Canadian General Electric
Quick facts: Kanupp was extensively refurbished in 2002-2004 and is the oldest Candu-type reactor still in operation.

Photograph courtesy of Pakistan AEC
Posted 16 Apr 2005