Solar Power Plants in Germany - other states

Alt Daber
Location: BB
Operator: Solarpark Alt Daber
Configuration: 67.8 MWp
Operation: 2011
System supplier: First Solar
EPC: Belectric Solarkraftwerke
Quick facts: In Oct 2011, NIBC Infrastructure & Renewables closed financing for the Alt Daber project with BayernLB and Investkredit. The 125ha project has 850,000 thin film solar modulces erected at the site of a former military airport 100km northwest of Berlin.

Photograph courtesy Belectric Solarkraftwerke
Posted 26 May 2012

Bad Dürrheim
Location: BW
Operator: Energiedienst AG
Configuration: 22.5 kWp
Operation: 2000
System supplier: ??

Photograph by NaturEnergie AG
Posted 25 Apr 2004

Hennigsdorf Allton
Location: BE
Operator: Allton Fertigteile GmbH
Configuration: 225 kWp
Operation: 2005-2007
System supplier: Sharp
EPC: Siemens
Quick facts: This factory rooftop installation was extended in 2007 with 1,248 solar modules from Sharp which were connected together into 26 solar panels, twelve junction boxes, and two 100-kVA master/slave Sinvert Solar inverters. The system is connected to the Berlin public power supply network.

Photograph courtesy of Siemens
Posted 29 Mar 2008

FinowTower
Location: BB
Operator: FinowTower GmbH & Co KG
Configuration: 24.24 MWp
Operation: 2010
System supplier: Suntech
EPC: SolarHybrid
Quick facts: At completion, this was the fifth largest PV power plant in Germany. The site is at Schorfheide near Eberswalde and was financed and developed by ecolutions

Photograph courtesy of SolarHybrid
Posted 2 Feb 2005

Geiseltalsee
Location: ST
Operator: Solar Anlage Geiseltalsee Betriebs GmbH
Configuration: 4 MWp
Operation: 2004
System supplier: BP Solar
Quick facts: At completion, this was the fifth largest PV power plant in the world.

Photograph courtesy of BP Solar
Posted 2 Feb 2005

Hauptschule Drimborn
Location: NW
Operator: Hauptschule Drimborn
Configuration: 7 kWp
Operation: 1999
System supplier: ??

Photograph courtesy of Umweltkontor
Posted 2 May 2004

Lieberose
Location: BB
Operator: juwi GmbH
Configuration: 53 MWp
Operation: 2002
System supplier: First Solar
EPC: juwi
Quick facts: This plant is built on 162ha of a former military training site near Cottbus. At completion, it became Germanys' largest PV plant and the second largest in the world. The project cost €160mn and was 80% financed by a German banking consortium and 20% by juwi and Fist Solar. In total, 300ha will be cleaned of munitions and after 20yrs of plant operation, all the solar equipment will be recycled and the property restored to meadowlands.

Photograph courtesy of juwi GmbH
Posted 15 Aug 2009

Meuro
Location: BB
Operator: GP JOULE GmbH
Configuration: 70 MWp
Operation: 2011
System supplier: Canadian Solar
EPC: GP JOULE
Quick facts: This 152ac project was built on old lignite mining areas in Senftenberg and became the country's largest PV plant on completion in Feb 2011. Financing partners for the €140mn project included HSH Nordbank, Unlimited Energy and LUXCARA.

Photograph courtesy of GP JOULE GmbH
Posted 26 May 2012

Morbach
Location: RP
Operator: juwi GmbH
Configuration: 490 kWp
Operation: 2002
System supplier: Kyocera, Conergy
EPC: juwi
Quick facts: After the withdrawal of the US forces from the largest ammunition dump in Central Europe, the site's 145ha of land were returned to the municipality of Morbach. It is now being developed into a renewable energy park with wind turbines, PV panels, biogas CHP, and a wood pellet production plant.

Photograph courtesy of juwi GmbH
Posted 2 Sep 2007

Solarpark Greifswald
Location: MV
Operator: Solarpark Greifswald
Configuration: 1.77 MWp
Operation: 2004
System supplier: BP Solar
Quick facts: This facility is on the site of the closed Greifswald nuclear plant (4 X 440 MW).

Photograph courtesy of BP Solar
Posted 2 Feb 2005

Waldpolenz
Location: SN
Operator: juwi GmbH
Configuration: 40 MWp
Operation: 2007-2008
System supplier: First Solar
EPC: juwi
Quick facts: The PV array covers an area 2km long by 600m wide at a former military airfield near Leipzig. Advanced thin-film modules were installed at about €3,250/kW, some 20% less than the cost for German plants then being installed. SachsenFonds GmbH -- a fund marketing and administration company of Sachsen LB Group – offered equity to interested investors in the form of closed-end funds.

Photograph courtesy of juwi GmbH
Posted 2 Sep 2007

Wyhlen Solar
Location: BW
Operator: Energiedienst AG
Configuration: 72.5 kWp
Operation: 1999
System supplier: ??

Photograph by NaturEnergie AG
Posted 25 Apr 2004