Solar Power Plants in Germany - other Länder
![]() |
![]() |
![]() |
|
Bad Dürrheim Location: BW Operator: Energiedienst AG Configuration: 22.5 kWp Operation: 2000 System supplier: ?? Photograph courtesy of NaturEnergie AG |
Föhren Location: RP Operator: Stadtwerke Trier AoR Configuration: 8.4 MWp Operation: 2009 System supplier: Conergy EPC: Conergy Photograph courtesy of Conergy |
Hennigsdorf Allton Location: BE Operator: Allton Fertigteile GmbH Configuration: 225 kWp Operation: 2005-2007 System supplier: Sharp EPC: Siemens Quick facts: This factory rooftop installation was extended in 2007 with 1,248 solar modules from Sharp which were connected together into 26 solar panels, twelve junction boxes, and two 100-kVA master/slave Sinvert Solar inverters. The system is connected to the Berlin public power supply network. Photograph courtesy of Siemens |
![]() |
![]() |
![]() |
|
Geiseltalsee Location: ST Operator: Solar Anlage Geiseltalsee Betriebs GmbH Configuration: 4 MWp Operation: 2004 System supplier: BP Solar Quick facts: At completion, this was the fifth largest PV power plant in the world. Photograph courtesy of BP Solar |
Grimmen Location: MV Operator: EBB Renewable Energy GmbH Configuration: 8 MWp Operation: 2012 System supplier: Conergy EPC: Conergy Quick facts: This 20ha site has about 35,000 Conergy PowerPlus modules made in Fankfurt (Oder). The project was developed and invested by Conergy, EBB, and Stephan Johannsen. Photograph courtesy of Conergy |
Hauptschule Drimborn ocation: NW Operator: Hauptschule Drimborn Configuration: 7 kWp Operation: 1999 System supplier: ?? Photograph courtesy of Umweltkontor |
![]() |
![]() |
![]() |
|
Mehring-IV Location: RP Operator: Stadtwerke Trier AoR Configuration: 1.2 MWp Operation: 2012 System supplier: Conergy EPC: Conergy Quick facts: This plant was awarded in Jun 2012 and is alongside Federal Motorway A1. At the time, Conergy had done over 10 MW of PV projects with Stw Trier. Photograph courtesy of Conergy |
Morbach Location: RP Operator: juwi GmbH Configuration: 490 kWp Operation: 2002 System supplier: Kyocera, Conergy EPC: juwi Quick facts: After the withdrawal of the US forces from the largest ammunition dump in Central Europe, the site's 145ha of land were returned to the municipality of Morbach. It is now being developed into a renewable energy park with wind turbines, PV panels, biogas CHP, and a wood pellet production plant. Photograph courtesy of juwi GmbH |
Solarpark Greifswald Location: MV Operator: Solarpark Greifswald Configuration: 1.77 MWp Operation: 2004 System supplier: BP Solar Quick facts: This facility is on the site of the closed Greifswald nuclear plant (4 X 440 MW). Photograph courtesy of BP Solar |
![]() |
![]() |
|
|
Waldpolenz Location: SN Operator: juwi GmbH Configuration: 40 MWp Operation: 2007-2008 System supplier: First Solar EPC: juwi Quick facts: The PV array covers an area 2km long by 600m wide at a former military airfield near Leipzig. Advanced thin-film modules were installed at about €3,250/kW, some 20% less than the cost for German plants then being installed. SachsenFonds GmbH -- a fund marketing and administration company of Sachsen LB Group – offered equity to interested investors in the form of closed-end funds. Photograph courtesy of juwi GmbH |
Wyhlen Solar Location: BW Operator: Energiedienst AG Configuration: 72.5 kWp Operation: 1999 System supplier: ?? Photograph by NaturEnergie AG |
|
![]() |
||