|
Bellinzona
Location: Ticino
Operator: Aziende Municipalizzate Bellinzona
Configuration: 3 kWp
Operation: 1992
System supplier: ??
Quick facts: This facility has 25 sq m of panels on the Semine di Bellinzone school.
Photograph courtesy of Aziende Municipalizzate Bellinzona
Posted 11 Dec 2005 |
Burglen
Location: Uri
Operator: Elektrizitätswerk Altdorf AG
Configuration: 100 kWp
Operation: 2005
T/G supplier: BP Solar
Photograph courtesy of Elektrizitätswerk Altdorf AG
Posted 26 Dec 2008 |
Monte Rosa
Location: Valais
Operator: Swiss Alpine Club
Configuration: 20 kWp
Operation: 2010
System supplier: ??
Quick facts: This special mountain hut was planned by the ETH
Zurich Department of Architecture. The site is in a pristine location at a height of 2,883m
near Zermatt. The four-floor, wooden pre-fabricated structure is 90%
self-sufficient in energy. The project manager was
dipl-Architekt Marcel Baumgartner at ETH. The hut opened in Sep
2009.Artist's impression courtesy of ETH
Posted 26 Jun 2010 |
|
SIG Solar III
Location: Geneve
Operator: Services Industriels de Genève
Configuration: 1 MWp
Operation: 2005
System supplier: Isofoton
Quick facts: At completion, this became the largest PV plant in
Switzerland. The 16,000 sg m facility is adjacent to the Verbois hydro
plant.
Photograph courtesy of Services Industriels de Genève
Posted 18 Nov 2005 |
|
Windisch PV
Location: Aargau
Operator: Proma Energie AG
Configuration: 10 kWp
Operation: 2000
System supplier: ??
Photograph courtesy of Proma Energie AG
Posted 29 Dec 2007 |