Anglesea
Location: VIC
Operator: Alcoa of Australia
Configuration: 1 X 160 MW
Fuel: brown coal
Operation: 1969
Boiler supplier: John Thompson
T/G supplier: Siemens
EPC: Ebasco
Quick facts: Anglesea employs
approximately 110 people and supplies more than 40% of the power required
by Alcoa's Point Henry smelter near Geelong. Fuel is supplied from an
open-cut coal mine about 3km away.
Photograph courtesy of
Alcoa of Australia
Posted 6 Jun 2007 |
Hazelwood
Location: VIC
Operator: Hazelwood Power Corp
Configuration: 8 X 200 MW
Fuel: brown coal
Operation: 1964-1971
Boiler supplier: Babcock Power
T/G supplier: GEC, Parsons
Quick facts: Hazelwood power station is in the Latrobe Valley. In 1996,
the power station and associated mine were sold for A$2.35bn. The current
owners are International Power (91.8% share) and Commonwealth Bank Group
(8.2%). . The plant can supply around a quarter of Victoria’s load.
Photograph courtesy of International
Power plc
Posted 1 Sep 2003 |
Loy Yang-A
Location: VIC
Operator: Loy Yang Power Management
Configuration: 4 X 500 MW
Fuel: brown coal
Operation: 1985-1987
Boiler supplier: ICL
T/G supplier: BBC, Siemens
Quick facts: Loy Yang A was sold in May 1997 as part of the Victorian
Government's privatisation strategy. In Apr 2004, the plant was was sold
to the Great Energy Alliance Corporation (GEAC) consisting of AGL, Tokyo
Electric Power Co and a group of investors led by the Commonwealth Bank of
Australia.
Photograph courtesy of Loy
Yang Power Management
Posted 18 Apr 2004 |
|
Loy Yang-B
Location: VIC
Operator: International Power Australia
Configuration: 2 X 500 MW
Fuel: brown coal
Operation: 1993-1996
Boiler supplier: ICL, Transfield
T/G supplier: Hitachi
Quick facts: Sold in 1995 to Mission Energy and resold to a 70:30
partnership of International Power and Mitsui.as part of a large deal in
Dec 2004.
Photograph courtesy of Edison Mission
Holdings
Posted 19 May 2001 |
Morwell
Location: VIC
Operator: Energy Brix Australia
Configuration: 1 X 20 MW, 3 X 30 MW, 1 X 60 MW
Fuel: brown coal
Operation: 1958-1962
Boiler supplier: Mitchell
T/G supplier: M-V, Stal
Photograph courtesy of SEC Victoria
Posted 16 Feb 2003 |
Yallourn-W
Location: VIC
Operator: Yallourn Energy Pty Ltd
Configuration: 2 X 360 MW, 2 X 380 MW
Fuel: brown coal
Operation: 1973-1982
Boiler supplier: John Thompson, ICL
T/G supplier: Toshiba
Quick facts:
ABB Australia managed A$50mn I&C modernization program for Yallourn
completed in 2006. The station's natural draft
cooling towers were the first of their kind in Australia.
Photograph courtesy of Yallourn Energy
Pty Ltd
Posted 29 Jul 2004 |