Alegrete
Location: RS
Operator: Tractebel Energia SA
Configuration: 2 X 33 MW
Operation: 1968
Fuel: coal, oil Boiler supplier: Ansaldo
T/G supplier: Ansaldo, CGE
Photograph courtesy of Tractebel
Energia
Posted 22 May 2004 |
Charqueadas
Location: RS
Operator: Tractebel Energia SA
Configuration: 4 X 18 MW
Operation: 1962-1969
Fuel: coal Boiler supplier: Steinmuller
T/G supplier: AEG Photograph courtesy of Tractebel
Energia
Posted 22 May 2004 |
Figueira
Location: PR
Operator: Cia Paranaense de Energia (COPEL)
Configuration: 2 X 10 MW
Operation: 1963-1974
Fuel: coal Boiler supplier: Stein
T/G supplier: ??
Quick facts: This plant in the Rio do Peixe
valley uses local coal.
Photograph courtesy of Cia Paranaense de Energia (COPEL)
Posted 22 May 2004 |
|
Jorge Lacerda-A
Location: SC
Operator: Tractebel Energia SA
Configuration: 2 X 50 MW, 2 X 66 MW
Operation: 1965-1974
Fuel: coal Boiler supplier: MAN, Ansaldo
T/G supplier: MAN, BBC, Ansaldo, ASGEN
Photograph courtesy of Tractebel
Energia
Posted 22 May 2004 |
Jorge Lacerda-B
Location: SC
Operator: Tractebel Energia SA
Configuration: 2 X 131 MW
Operation: 1979-1980
Fuel: coal Boiler supplier: Tlmace
T/G supplier: Skoda Photograph courtesy of Tractebel
Energia
Posted 16 May 2004 |
Jorge Lacerda-C
Location: SC
Operator: Tractebel Energia SA
Configuration: 1 X 363 MW
Operation: 1996
Fuel: coal Boiler supplier: Tlmace
T/G supplier: Ansaldo, Skoda
Photograph courtesy of Tractebel Energia
Posted 22 May 2004 |
|
Porto do Itaqui
Location: MA
Operator: MPX Energia SA
Configuration: 1 X 365 MW
Operation: 2011
Fuel: coal
Boiler supplier: Doosan-Babcock
T/G supplier: Siemens
EPC: Mabe Construção e Administração de Projetos Ltda, Cesbe
Quick facts: Ths unit will supply an average of 65% of the electricity
demand of Maranhao. In Mar 2009, IBAMA granted the installation license.
In Dec 2009, the financing package was approved by BNDES, Banco Bradesco,
Banco Votorantim and BNB for a total of R$1.241bn. The total investment is
expected to be R$ 1.6bn. Photo is from Jan 2011.
Photograph courtesy of MPX
Posted 9 Apr 2011 |
|
Porto do Pecém
Location: CE
Operator: Energia Pecém
Configuration: 3 X 365 MW
Operation: 2011-2012
Fuel: coal
Boiler supplier: Doosan-Babcock
T/G supplier: Siemens
EPC: Mabe Construção e Administração de Projetos Ltda
Quick facts: Energia Pecém comprises two 360-MW units and is a 50:50 JV of
MPX and EDP. In Mar 2009, IDB approved a financing package for the first
two sets and in May 2009, approved a R$1.4bn loan. Construction began in
July 2008. The third unit is 100% owned by MPX. The two phases sold into
the A-5 energy auctions held in Oct 2007 and Sep 2008, respectively.
Photograph courtesy of MPX
Posted 9 Apr 2011 |