Baihe
Location: Chongqing
Operator: China Power Investment Corp
Configuration: 2 X 300 MW
Operation: 2004-2005
Fuel: coal
Boiler supplier: Dongfang
T/G supplier: Dongfang
EPC: China Power Engineering Consulting Group, Southwest Electric Power Design Institute, Chongqing Electric Power Constr
Quick facts: Each unit has wet limestone scrubbers from CPI Yuanda.
Photograph courtesy of CPI Yuanda Environmental
Posted 30 Dec 2007 |
Shuanghuai
Location: Chongqing
Operator: China Power Investment Corp
Configuration: 2 X 300 MW
Operation: 2006
Fuel: coal
Boiler supplier: Dongfang
T/G supplier: Dongfang
EPC: Chongqing Jiulong Electric Power, Shanxi Electric Power Constr
Quick facts: Also known as Chongqing Hechuan. This plant cost about
Rmb5.19bn. Unit-1 went online on 1 Aug 2006. Each unit has wet limestone
scrubbers from CPI Yuanda.
Photograph courtesy of CPI Yuanda Environmental
Posted 30 Dec 2007 |
Songzao
Location: Chongqing
Operator: Songzhao Coal & Electricity Co
Configuration: 2 X 160 MW
Operation: 2005
Fuel: anthracite gangue
Boiler supplier: ??
T/G supplier: ??
Photograph courtesy of China Energy Conservation Investment Corp
Posted 15 Jul 2007 |