Datang Gangu
Location: Gansu
Operator: Datang Gansu Power Generation Co Ltd
Configuration: 2 X 330 MW
Operation: 2007
Fuel: coal
Boiler supplier: Shanghai
T/G supplier: Beijing Beizhong
EPC: Northwest Electric Power Design Institute, Chongqing Electric Power Construction Corp
Quick facts: In Aug 2006, first concrete was poured for these two units
and the plant entered commercial operation in Dec 2007. These are
air-cooled units with ESPs, wet limestone scrubbers, low-Nox combustion
systems, and zero water discharge. The site in Gangu County, Tianshui
Prefecture, was originally built in 1969 with two 12-MW units, closed
in June 2007.
Photograph courtesy of Datang Gansu Power Generation CO
Posted 3 Aug 2010 |
Jingyuan-2
Location: Gansu
Operator: SDIC Huajing Power Holdings Ltd
Configuration: 2 X 320 MW, 2 X 300 MW
Operation: 1996-2007
Fuel: bituminous coal Boiler supplier: Wuhan
T/G supplier: Shanghai
EPC: China Power Complete Equipment Co
Quick facts: The Jingyuan-2 power plant development compay was formed in
1995 to develop this minemouth plant. Ownership is by SDIC (51.22%), Meiya Power (30.73%), Gansu
Electric Investment Co Ltd (15.37%) and China Guodian Corp (2.68%). The first
two units were uprated from 300 MW.
Photograph courtesy of SDIC Huajing Power Holdings Co Ltd
Posted 14 Mar 2010 |
Ningxia Lingwu
Location: Ningxia
Operator: Huadian Power International Corp Ltd
Configuration: 2 X 600 MW, 2 X 1,060 MW
Operation: 2007-2011
Fuel: bituminous coal
Boiler supplier: Dongfang
T/G supplier: Shanghai, Dongfang
EPC: SEPCO3, Ningxia Electric Power Construction
Quick facts: Unit-4 completed its 168hr run on 24 Apr 2011, 8mos ahead of
schedule after 25mos of construction. This is now the largest thermal
power plant in Northwest China. The 1,060-MW, ultrasupercritical sets were
the largest air-cooled units built to date.
Photograph courtesy of www.nx.xinhua.org
Posted 4 Jun 2011 |
|
Pingliang-1
Location: Gansu
Operator: Huaneng Power International
Configuration: 4 X 300 MW
Operation: 2000-2003
Fuel: bituminous coal
Boiler supplier: Harbin
T/G supplier: Harbin
EPC: Northwest Electric Power Design Institute
Quick facts: This large mine-mouth plant is in Ershilipu, Pingliang, the
border region between Shaanxi, Gansu and Ningxia. The plant was initially
developed by a JV of China Northeast Power Group (55%), Gansu Power
Construction Investment Corp (35%) and Gansu Provincial Power Corp (10%).
In Jan 2005, Huaneng Power assumed management control. Phase-I of the
power plant covers an area of 64ha and cost Rmb 5.18bn. Construction on
the first pair of units started in Jun 1998 and they went commercial on 6
Sep 2000 and 30 Jun 2001, respectively. Construction on the second pair of
units began in May 2001 and they came online on 5 Jun 2003 and 30 Nov
2003, respectively. Two 600-MW, air-cooled units were added to the site in
2010.
Photograph courtesy of Huaneng Power
Posted 12 Jan 2010 |
|
Yuanyang Lake
Location: Ningxia
Operator: Shandong Luneng Group Co Ltd
Configuration: 2 X 660 MW
Operation: 2010-2011
Fuel: bituminous coal
Boiler supplier: ??
T/G supplier: Dongfang
EPC: Shandong Electric Power Engineering & Consulting Institute, Ningxia Electric Power Construction
Quick facts: In Mar 2009, Shandong Luneng began construction on these supercritical, air-cooled units in Lingwu County, Yinchuan City. Unit-1 went commercial on 30 Dec 2010 and Unit-2 was put into operation on 26 Jun 2011. The project connects to the Ningdong-Shandong ±660kV HVDC transmission line.
Photograph courtesy of Zhongshi Yitong Group
Posted 22 Nov 2011
|