Coal-Fired Plants in Hubei & Shaanxi

Baoji-2
Location: Shaanxi
Operator: China Guodian Corp
Configuration: 4 X 300 MW
Operation: 1998-2001
Fuel: bituminous coal
Boiler supplier: Dongfang
T/G supplier: Dongfang
EPC: Northwest Electric Power Design Institute, Fourth Engineering Corp of Northwest Power Construction
Quick facts: The Baoji-2 genco was founded in Nov 1994 and construction got underway in Jul 1996. The last unit commissioned in Feb 2001 and the project was transferred from State Grid Xinyuan Co to China Guodian in Dec 2007.

Photograph courtesy of China Guodian Corp
Posted 30 May 2010

Datang Binchang
Location: Shaanxi
Operator: Datang International Power Generation Co Ltd
Configuration: 2 X 600 MW
Operation: 2009
Fuel: bituminous coal
Boiler supplier: Shanghai
T/G supplier: ??
EPC: Shaanxi Northwest Power Construction Corp, Tianjin Electric Power Construction Co
Quick facts: This power station is in Xianyang City.

Photograph courtesy of Tianjin Electric Power Construction Co
Posted 7 Jul 2010

Ezhou
Location: Hubei
Operator: Hubei Electric Power Co
Configuration: 2 X 350 MW, 2 X 600 MW
Operation: 1999-2009
Fuel: anthracite, bituminous coal
Boiler supplier: Foster Wheeler, Dongfang
T/G supplier: Hitachi
EPC: Raytheon, Hubei Second Electric Power Construction Engineering Co
Quick facts: Units 1&2 have arch-fired boilers and started operations in Apr 1999. The project was funded by a ¥31.9bn loan from JICA. Phase-II was approved in 2007.

Photograph courtesy of www.steeldeck.cn
Posted 2 Jun 2010

Huanggang Dabieshan
Location: Shaanxi
Operator: China Power International Holding Ltd
Configuration: 2 X 600 MW
Operation: 2008
Fuel: bituminous coal
Boiler supplier: Harbin, Mitsui Babcock
T/G supplier: Harbin, Alstom Beizhong Power
Quick facts: This supercritical plant is in Machen City.

Photograph courtesy of www.cnhubei.com
Posted 27 Jul 2011

 

Jingmen
Location: Hubei
Operator: China Guodian Group Corp
Configuration: 2 X 100 MW, 2 X 200 MW, 2 X 600 MW CHP
Operation: 1979-2007
Fuel: bituminous coal, oil
Boiler supplier: Harbin, Babcock-Hitachi Dongfang
T/G supplier: Harbin
EPC: Central Southern China Electric Power Design Institute, Hubei Second Electric Power Construction Engineering Co
Quick facts: Units 4&5 were chosen as partner plants for an IEA/G8 power plant best practices audit in 2008. In 2006, Unit-5 was retrofit with an Alstom NID scrubber furnished by Clean Environmental Protection Engineering.

Photograph courtesy of Hubei Second Electric Power Construction Engineering Co
Re-posted 1 May 2011

 

Jinjie
Location: Shaanxi
Operator: China Shenhua Energy Co Ltd
Configuration: 4 X 600 MW
Operation: 2006-2007
Fuel: bituminous coal
Boiler supplier: Shanghai
T/G supplier: ??
Quick facts: Jinjie-1 went commercial on 30 Sep 2006 and is the first Chinese power plant with a distributed control suystem (DCS) from an indigenous supplier, in this case HollySys. The Jinjie plant is the terminus of the north leg of the 500kV west-to-east transmission project. The Jinjie coal resource base in Shenmu County is estimated to be 525mn tons and annual coal burn by Jinjie 1-4 is expected to be 10mn tons. China Development Bank provided Rmb2,776mn to support the Jinjie project. A third phase at the plant is planned with two more 600-MW sets.

Photograph courtesy of China Shenhua Energy Co Ltd
Posted 7 Jan 2009

Shenmu
Location: Shaanxi
Operator: CLP Guohua Shenmu Power Co
Configuration: 2 X 100 MW
Operation: 2000
Fuel: coal
Boiler supplier: Beijing
T/G supplier: Beijing
Quick facts: The plant is owned by by Beijing Guohua Electric Power Corp and CLP Group. The plant is at the end of the Shaanxi grid near Shenfu Dongsheng Coal Mine and supports nearby enterprises as well as the Shenmu-Suozhou electrified railway.

Photograph courtesy of CLP Group
Posted 7 Feb 2004

Yangluo-III
Location: Hubei
Operator: Huaneng Power International Inc
Configuration: 2 X 600 MW
Operation: 2006
Fuel: anthracite
Boiler supplier: Babcock-Hitachi Dongfang
T/G supplier: ??
Quick facts: Phases I&II were each 2 X 300 MW. A pair of 1,000-MW sets are now planned for the Yangluo site.

Photograph courtesy of Hubei Institute of Science and Technology Information Promotion
Posted 9 Jan 2011

Yichang East
Location: Hubei
Operator: East Sun Industrial Development Co Ltd
Configuration: 2 X 300 MW CHP
Operation: 2010
Fuel: anthracite
Boiler supplier: Dongfang
T/G supplier: Dongfang
EPC: Hubei Second Electric Power Construction Engineering Co
Quick facts: This CFB project was approved by NDRC in Nov 2007 and construction began in Apr 2008. The units went online in Sep and Dec 2009, respectively. The captive power project is invested by Yidu East Sunshine Biochemical Pharmaceutical Co Ltd.

Photograph courtesy of Hubei Second Electric Power Constr EngineeringPosted 16 Mar 2011

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 07/27/11