Coal-Fired Plants in China - Hubei
Ezhou
Location: Hubei
Operator: Hubei Electric Power Co
Configuration: 2 X 350 MW, 2 X 600 MW
Operation: 1999-2009
Fuel: anthracite, bituminous coal
Boiler supplier: Foster Wheeler, Dongfang
T/G supplier: Hitachi
EPC: Raytheon, Hubei Second Electric Power Construction Engineering Co
Quick facts: Units 1&2 have arch-fired boilers and started operations in Apr 1999. The project was funded by a ¥31.9bn loan from JICA. Phase-II was approved in 2007.

Photograph courtesy of www.steeldeck.cn
Posted 2 Jun 2010

Jingmen
Location: Hubei
Operator: China Guodian Group Corp
Configuration: 2 X 100 MW, 2 X 200 MW, 2 X 600 MW CHP
Operation: 1979-2007
Fuel: bituminous coal, oil
Boiler supplier: Harbin, Babcock-Hitachi Dongfang
T/G supplier: Harbin
EPC: Central Southern China Electric Power Design Institute, Hubei Second Electric Power Construction Engineering Co
Quick facts: Units 4&5 were chosen as partner plants for an IEA/G8 power plant best practices audit in 2008. In 2006, Unit-5 was retrofit with an Alstom NID scrubber furnished by Clean Environmental Protection Engineering.

Photograph courtesy of Hubei Second Electric Power Construction Engineering Co
Re-posted 1 May 2011

Puqi
Location: Hubei
Operator: China Resources Power Hubei Co Ltd
Configuration: 2 X 300 MW, 2 X 1,000 MW
Operation: 2004-2013
Fuel: bituminous coal
Boiler supplier: Shanghai
T/G supplier: Shanghai
EPC: Shanghai Shinco Electric Power Engineering Co, Central Southern China Electric Power Design Institute, Hubei No 2 Electric Power Construction
Quick facts: Puqi Phase 2 has a pair of USC units approved by the NRDC on 14 Apr 2010. The Rmb 6.3bn project started construction in 28 Oct 2010. The second 1-GW unit commissioned on 13 Aug 2013.

Photograph courtesy of news.cnhubei.com
Posted 21 Aug 2013

Yangluo-III
Location: Hubei
Operator: China Huaneng Group
Configuration: 2 X 600 MW
Operation: 2006
Fuel: anthracite
Boiler supplier: BHDB
T/G supplier: Harbin
EPC: Central Southern China Electric Power Design Institute, Hubei No 2 Thermal Power Construction Co
Quick facts: . Phase-III of the Yangluo plant consists of two 600-MW sets completed in Oct and Dec 2006, respectively. China Huaneng is a 75% owner of the Yangluo power station with Wuhan New Energy Development Co Ltd holding 25%.

Photograph courtesy of China Huaneng Group
Posted 9 Jan 2011

Yichang East
Location: Hubei
Operator: East Sun Industrial Development Co Ltd
Configuration: 2 X 300 MW CHP
Operation: 2010
Fuel: anthracite
Boiler supplier: Dongfang
T/G supplier: Dongfang
EPC: Hubei Second Electric Power Construction Engineering Co
Quick facts: This CFB project was approved by NDRC in Nov 2007 and construction began in Apr 2008. The units went online in Sep and Dec 2009, respectively. The captive power project is invested by Yidu East Sunshine Biochemical Pharmaceutical Co Ltd.

Photograph courtesy of Hubei Second Electric Power Constr Engineering
Posted 16 Mar 2011

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base