Coal-Fired Plants in China - Hunan

 

Huadian Shimen
Location: Hunan
Operator: Hunan Electric Power Co
Configuration: 4 X 300 MW
Operation: 1996-2006
Fuel: anthracite coal
Boiler supplier: Harbin
T/G supplier: Harbin
EPC: Hunan Electric Power Design Institute
Quick facts: In Sep 2004, Marsulex licensee China Huadian Engineering Co (CHEC) was awarded a contract to supply wet limestone FGDs for Units 3&4.

Photograph courtesy of Hunan Electric Power Design Inst
Posted 13 Apr 2008

 

Jinzhushan
Location: Hunan
Operator: Hunan Huayin Electric Power Co Ltd
Configuration: 2 X 50 MW, 4 X 125 MW
Operation: 1972-1984
Fuel: anthracite coal
Boiler supplier: Shanghai
T/G supplier: ??

Photograph courtesy of Hunan Datang Xianyi Technology Co Ltd
Posted 19 Apr 2005

 

Leiyang
Location: Hunan
Operator: Hunan Electric Power Co
Configuration: 2 X 200 MW, 2 X 300 MW
Operation: 1988-2004
Fuel: anthracite coal
Boiler supplier: Harbin, Babcock & Wilcox Beijing
T/G supplier: Harbin, Dongfang
EPC: Hunan Electric Power Design Institute, Black & Veach
Quick facts: In Jun 2001, Babcock & Wilcox won a $75mn contract to expand the Leiyang power station. The expansion was partly funded by the World Bank, which provided $200mn in loans. The plant is tied to the grid at 220kV. In December 2000, Hunan Electric Power Bureau was dissolved and its successor Hunan Electric Power Co reorganized into a limited liability company to focus on T&D and dispatching. The HEPC thermal plants were transferred to China Datang Group.

Photograph courtesy of Hunan Electric Power Design Inst
Posted 30 Mar 2008

Liyujiang-2
Location: Hunan
Operator: China Resources Power Holdings Co
Configuration: 2 X 300 MW
Operation: 2003
Fuel: coal
Boiler supplier: Dongfang
T/G supplier: Harbin
EPC: Hunan Provincial Power Investigation and Design Institute
Quick facts: The plant is a component of the west-to-east power transmission project and supplies power to Guangdong Province via its own 185km, 500kV transmission line. This cost 346mn yuan. Coal is sourced from Hunan, Henan and Shanxi provinces. CR Power owns a 60% interest in the plant.

Photograph courtesy of China Resources Power Holdings Co
Posted 15 Feb 2004
 

Xiangtan II
Location: Hunan
Operator: Datang International Power Corp
Configuration: 2 X 600 MW
Operation: 2007
Fuel: anthracite coal
Boiler supplier: Babcock-Hitachi Dongfang Boiler Co
T/G supplier: ??
EPC: Hunan Electric Power Design Institute
Quick facts: These supercritical units have wet limestone FGD systems from China Datang Technologies. The Phase I plant has two 300-MW sets online in 1998.

Photograph courtesy of Hunan Electric Power Design Inst
Posted 13 Apr 2008

 

Yongxing
Location: Hunan
Operator: Yongxing Power Plant Corp
Configuration: 2 X 60 MW
Operation: 2008
Fuel: waste coal
Boiler supplier: ??
T/G supplier: ??
Quick facts: In Nov 2007, Yongxing Power (60% owned by ONA Energy) signed three contracts with local suppliers for 280,000 to 330,000 tpy of waste coal and tailings for its CFB power plant project. Each of the first-phase 60-MW units will consume about 200,000 tpy of tailings and coal in a 2:1 ratio. The average delivered coal price is approximately RMB 300 (USD40) per ton and the average delivered coal tailings price is RMB 60 (UD$8) per ton. The all-in cost for coal and coal tailings is expected to be RMB 0.22/kWh (US$ 0.029). Hunan Province Price Bureau set an initial electricity tariff rate for this plant of RMB 0.420 RMB/kWh (USD0.06). The plant is connected to the Hunan grid at 110kV.

Photograph courtesy of ONA Energy
Posted 8 Jan 2008

 

Yiyang II
Location: Hunan
Operator: Hunan Yiyang Power Co Ltd
Configuration: 2 X 600 MW
Operation: 2007
Fuel: bituminous coal
Boiler supplier: Harbin
T/G supplier: ??
EPC: Hunan Electric Power Design Institute
Quick facts: These supercritical units have wet limestone FGD systems from Beijing Bootes Electric Power Sci-Tec Co Ltd. The Phase I plant has two 300-MW sets online in 2001.

Photograph courtesy of Hunan Electric Power Design Inst
Posted 13 Apr 2008

 

Zhuzhou II
Location: Hunan
Operator: Datang Hunan Huayin Electric Power Co Ltd
Configuration: 2 X 125 MW, 2 X 300 MW
Operation: 1993-2004
Fuel: anthracite coal
Boiler supplier: Shanghai, Dongfang
T/G supplier: Harbin
EPC: Hunan Electric Power Design Institute
Quick facts: Installation of the 300-MW sets was approved in Jun 2001. They cost about RMB 2.25bn. Two 600-MW supercritical units are being added for service in 2009.

Photograph courtesy of Hunan Electric Power Design Inst
Posted 13 Apr 2008

Abbreviations: ABB = Asea Brown Boveri, BOT = build-own-transfer, CR Power = China Resources Power Holdings Co, CHP = combined heat and power, FW = Foster Wheeler, G-A = GEC-Alstom, GE = General Electric, IPP = independent power project, MHI = Mitsubishi Heavy Industries, tpy = tons per year, T/G = turbine generator

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 04/13/08