Dalate
Location: Inner Mongolia
Operator: Mengda Power Generation Co Ltd
Configuration: 6 X 330 MW
Operation: 1995-2005
Fuel: coal Boiler supplier: Beijing Boiler
T/G supplier: GEC-Alstom
EPC: Southwest Electric Power Design Institute
Quick facts: The plant operating company is controlled by China Hauneng
Group.
Photograph by Roger Yin (pbase)
Posted 18 Jun 2006 |
Dengfeng
Location: Henan
Operator: China Resources Power Holdings Co
Configuration: 2 X 300 MW
Operation: 2004
Fuel: coal Boiler supplier: ??
T/G supplier: ??
Quick facts:
Dengfeng is 85% owned by CR
Power. Construction started in Dec 2002 and took approximately 20 months,
about 6 months ahead of the average construction time for similar
generation units in the Chinese power industry.
Photograph courtesy of China Resources
Power Holdings Co
Posted 6 Nov 2004 |
Hequ
Location: Shanxi
Operator: Shanxi Luneng Hequ Power Generation Co Ltd
Configuration: 2 X 600 MW
Operation: 2004-2005
Fuel: bituminous coal Boiler supplier: Harbin
T/G supplier: ??
EPC: Shandong Electric Power Design Institute, SEPCO III
Quick facts: Hequ Phase Two will add two more 600-MW sets.
Photograph courtesy of SEPCOIII Electric Power Construction Corp
Posted 1 Jul 2007 |
|
 |
 |
 |
|
Huaneng Beijing
Location: Beijing
Operator: Huaneng Power International
Configuration: 1 X 75 MW, 2 X 165 MW, 2 X 220 MW CHP
Operation: ??-1999
Fuel: coal Boiler supplier: Deutsche Babcock, Wuhan
T/G supplier: TMZ, Electrosila
Quick facts: Also known as Huaneng Gaobeidian.
This plant is being retrofit by CPI Yuanda with a wet
limestone scrubber licensed from Austrian Energy & Environment. The new
system is expected online in Dec 2006.
Photograph courtesy of CPI Yuanda Environmental Protection Engineering Co Ltd
Posted 7 May 2005 |
Panshan
Location: Tianjin
Operator: CLP Guohua Power
Configuration: 2 X 500 MW
Operation: 1996
Fuel: hard coal Boiler supplier: Podoloski
T/G supplier: LMZ, Electrosila
Quick facts: This was the third supercritical plant in China.
Power is sold to North China Power (Group) Corp.
Panshan is owned by CLP Guohua Power Co Ltd (50%), North China Power
(Group) (25%), and Tianjin Jinneng Investment Co (25%). In Sep 2005, Power
Machines Group signed a servicing agreement for the Panshan and Suizhong
plants.
Photograph courtesy of CLP Group
Posted 24 Dec 2006 |
Pingdingshan
Location: Henan
Operator: China Power Investment Corp
Configuration: 1 X 50 MW, 2 X 210 MW
Operation: ??-2006
Fuel: coal Boiler supplier: ??
T/G supplier: ??
Quick facts: The 210-MW units have wet limestone scrubbers from CPI Yuanda.
Photograph courtesy of CPI Yuanda
Environmental
Posted 30 Dec 2007 |
|
 |
 |
 |
|
Shenmu
Location: Shaanxi
Operator:
CLP Guohua Shenmu Power Co
Configuration: 2 X 100 MW
Operation: 2000
Fuel: coal Boiler supplier: Beijing
T/G supplier: Beijing
Quick facts: The plant is owned by by Beijing Guohua Electric Power Corp and CLP
Group. The plant is at the end of the Shaanxi grid near Shenfu Dongsheng
Coal Mine and supports nearby
enterprises as well as the Shenmu-Suozhou electrified railway.
Photograph courtesy of CLP Group
Posted 7 Feb 2004 |
Shentou-2
Location: Shanxi
Operator: Shanxi Datang Shentou Power Generation Co Ltd
Configuration: 4 X 500 MW
Operation: 1992-2005
Fuel: bituminous coal Boiler supplier: Tlmace
T/G supplier: Skoda
EPC: Skoda
Quick facts: In 2000, Datang Power acquired a 60%
interest in the second phase at Shentou, which started construction in Aug
2002. In Dec 2004, Shentou-3 entered operation 16 months ahead of
schedule. The plant is connected at 500kV to the BTT grid. The cost of
Units 3&4 is estimated at Rmb 4.73bn. In June 2004, the basic tariff for
Shentou-2 was set at Rmb 270/MWh.
Photograph courtesy of Skoda
Export
Posted 6 Apr 2006 |
Suizhong
Location: Liaoning
Operator: Guohua Suizhong Power Generation Co Ltd
Configuration: 2 X 800 MW
Operation: 2000
Fuel: bituminous coal Boiler supplier: Taganrog
T/G supplier: LMZ, Electrosila
EPC: Teploelektroproekt Institute, No 3 Engineering Construction Co of
Liaoning Electric Power Corp
Quick facts: At completion, these two supercritical sets were the largest
thermal units in the country and were built for about Rmb 11bn. In
mid-1994, American Electric Power proposed to build a pair of 1,300-MW
coal-fired units at Suizhong, but this plan was later abandoned.
Photograph courtesy of Guohua Suizhong Power Generation Co Ltd
Posted 26 Mar 2008 |
 |
|
 |
|
Xinxiang Yuxin
Location: Henan
Operator: China Power Investment Corp
Configuration: 2 X 300 MW CHP
Operation: 2006
Fuel: coal Boiler supplier: Wuhan
T/G supplier: Shanghai
Quick facts: These units have wet limestone scrubbers from CPI Yuanda.
Photograph courtesy of CPI Yuanda
Environmental
Posted 30 Dec 2007 |
|
Yire
Location: Beijing
Operator: CLP Guohua Beijing Power
Configuration: 2 X 200 MW CHP
Operation: 1999
Fuel: coal Boiler supplier: Harbin
T/G supplier: ABB
Quick facts: Beijing Yire power station is in
Chaoyang District to the east of Tiananmen, Beijing. It is wholly owned by
CLP Guohua and supplies heat as well as electricity to Beijing city. Both
units have FGD systems, the second completed in 2003.
Photograph courtesy of CLP Group
Re-posted 24 Dec 2006 |
 |