Coal-Fired Plants in China - Shanghai

Shidongkou-1
Location: Shanghai
Operator: Huaneng Power International
Configuration: 1 X 320 MW, 3 X 300 MW
Operation: 1988-1990
Fuel: coal
Boiler supplier: Shanghai, Steinmuller, Babcock Borsig
T/G supplier: ??
EPC: Shanghai Power Erection Co No 2
Quick facts: This plant is in Shengqiao, Baoshan District, Shanghai, next to the Bao Steel Works. It was the first 1-GW plant in Shanghai. Development began in Apr 1982 and construction started in Apr 1985. The four units went commercial in Feb 1988, Dec 1988, Sep 1989 and May 1990. In Jan 2003, Shidongku-1 became fully owned by Huaneng Power.

Photograph courtesy of China Huaneng Group
Posted 20 Jan 2011

Shidongkou-2
Location: Shanghai
Operator: Huaneng Power International
Configuration: 2 X 600 MW, 2 X 660 MW
Operation: 1992-2009
Fuel: coal
Boiler supplier: CE, Sulzer
T/G supplier: ABB
EPC: S&L, Shanghai Electric Power Construction Co Ltd
Quick facts: Shidongkou-2 has China's first supercritical generating units. In 2009, the plant was extended with two ultrasupercritical plants. The site is adjacent to Shidongku-1 on the Yangtze River.

Photograph courtesy of China Huaneng Group
Re-posted 20 Jan 2011

Shanghai Caojing
Location: Shanghai
Operator: Shanghai Electric Power Co Ltd
Configuration: 2 X 1,000 MW
Operation: 2010
Fuel: bituminous coal
Boiler supplier: Shanghai
T/G supplier: Shanghai
EPC: China Power Investment Engineering Dept, Shanghai Power Construction Engineering Co Ltd
Quick facts: The plant construction office opened in Jun 2007 and Unit-1 completed its 168hr trial run on 12 Jan 2010 with an average load of 1,006 MW.

Photograph courtesy of Shandong Integrity Construction Supervision Co, Ltd
Posted 5 Jul 2010

 

 

Waigaoqiao-1
Location: Shanghai
Operator: Shenergy Co Ltd
Configuration: 4 X 300 MW
Operation: 1995-1997
Fuel: bituminous coal
Boiler supplier: Shanghai
T/G supplier: Shanghai
EPC: East China Electric Power Design Institute, Shanghai Power Erection No 2 Co

Photograph courtesy of Shanghai Power Erection No 2 Co
Posted 16 Apr 2010

 

Waigaoqiao-2
Location: Shanghai
Operator: Shenergy Co Ltd
Configuration: 2 X 980 MW
Operation: 2004
Fuel: bituminous coal
Boiler supplier: Alstom
T/G supplier: Siemens
EPC: Black & Veatch
Quick facts: These were China's first 900-MW class supercritical units. The 980-MW sets are said to have a thermal efficiency of 46%. Shanghai Waigaoqiao No 2 Electric Power Generating Co Ltd was invested by Shenergy Co Ltd (40%), GD Power Development Co Ltd (40%) and Shanghai Electric Power Co Ltd (49%). Construction started in May 2001 and the units went online in in Apr and Sep 2004, respectively.

Photograph courtesy of Siemens
Posted 30 Apr 2005