Coal-Fired Plants in China - Zhejiang
Beilun 1-6
Location: Zhejiang
Operator: China Guodian Corp
Configuration: 4 X 600 MW, 1 X 660 MW
Operation: 1991-2000
Fuel: bituminous coal
Boiler supplier: CE, BWC, IHI
T/G supplier: Toshiba, Alstom
EPC: Ebasco, S&L, Zhejiang Electric Power Construction Co
Quick facts: This extra-large TPP is at at Beilungang in the Beilun Special Economic Zone near the deepwater port of Ningbo City. The three in Phase-II were synchronized in Dec 1998, Nov 1999, and May 2000, and went commercial in Oct 2000, about 8mos ahead of schedule. In Nov 2004, an EPC consortium began construction on a program to retrofit each unit with a Tiandi FGD scrubber. Zhejiang Electric Power Construction Engineering Co was owner’s engineer for the program, which completed in Jul 2007. In Jan 2014, Unit-3 became the first unitin China to uprate from 600 MW to 660 MW following an extensive turbine and boiler modifications. Also, the unit's load following capability was enhanced.

Photograph courtesy of China Guodian Corp
Posted 23 Feb 2014

Beilun 7&8
Location: Zhejiang
Operator: China Guodian Corp
Configuration: 2 X 1,000 MW
Operation: 2009
Fuel: bituminous coal
Boiler supplier: BHDB
T/G supplier: Shanghai
EPC: East China Electrical Power Design Institute, Zhejiang Electric Power Construction Co
Quick facts: In Dec 2008,the first of two new 1,000-MW USC units was commissioned at Beilun, and the second followed in 2009 making it the largest thermal power plant in China at the time.

Photograph courtesy of China Guodian Corp
Posted 23 Feb 2014

Huaneng Yuhuan
Location: Zhejiang
Operator: Huaneng Power International
Configuration: 4 X 1,050 MW
Operation: 2006-2007
Fuel: coal
Boiler supplier: MHI, Harbin
T/G supplier: Shanghai
EPC: East China Electrical Power Design Institute, Zhejiang Power Design Institute, Tianjin Electric Power Construction
Quick facts: Huaneng Yuhuan is at Xiaqingtang on the southeast coast of Zhejiang in the Damaiyu Development Zone, Yuhuan County. The 110ha site was previously farm land and beachfront. These USC units have steam conditions of 263 bar with 600C temperature and reheat. The State Council approved the plant feasibility study in Dec 2003 and Unit-1 went commercial on 28 Nov 2006, the largest thermal unit in China. Total plant cost at the time was estimated to be Rmb 8.498bn. Emerson Process supplied an Ovation digital control system for the plant, which has precipitators from Feida, and wet limestone FGD systems from CPI Yuanda.

Photograph courtesy of China Huaneng Group
Posted 8 Nov 2009

Huzhou Lianshi
Location: Zhejiang
Operator: GCL-Poly Energy Holdings Ltd
Configuration: 2 X 15 MW CHP
Fuel: bituminous coal, waste coal
Operation: 2004
Boiler supplier: Wuxi Boiler Works, Tangshan Boiler Works, Jinan Boiler Works
T/G supplier: Nanjing
EPC: Zhejiang Chengjian Gas Heat Design Institute, Huzhou Construction Engineering Group
Quick facts: This plant has two CFB boilers and is in Huzhou City. The units went online in Sep and Dec 2004, respectively.

Photograph courtesy of GCL-Poly Energy Holdings Ltd
Posted 5 Jul 2010

Jiaxing
Location: Zhejiang
Operator: Jiaxing Power Generation Co Ltd
Configuration: 2 X 300 MW, 4 X 600 MW, 2 X 1,000 MW
Operation: 1995-2011
Fuel: bituminous coal
Boiler supplier: Shanghai, BWBC, Harbin
T/G supplier: GEC-Alstom, Dongfang, Shanghai
EPC: China Power Complete Equipment, Southeast China Electric Power Design Inst, Zhejiang Electric Power Design Inst, East China Investigation and Design Inst, Zhejiang Electric Power Construction, Zhejiang Power Co
Quick facts: In Jul and Dec 1995, respectively, two 300-MW coal-fired units were completed at this coastal site in Jiaxing Town, Pinghu City, about 20km west of Shanghai. The project cost about Rmb 3bn, of which 70% was contributed by Zhejiang Energy Group and 30% by Zhejiang Electric Power Corp. In Jun 2001, work started on Phase-II with four 600-MW units. The project was invested by Zhejiang Energy Group (53%), Zhejiang Southeast Electric Power (24%), and Shenhua Guohoa Electric Power (20%). Project approval was received in De 2002. The first two completed in Jul and Dec 2004, respectively, and Units 3&4, which came online in May and Oct 2005, respectively, all ahead of schedule. The second phase cost about Rmb 11bn with most of the funding being provided by State Construction Bank and Industrial Commercial Bank of China. In Aug 2009, construction started on Phase-III with two, 1,000-MW USC units. These cost about Rmb 7.89bn. Unit-1 went commercial on 23 Jun 2011, The construction period of 22mos and 6 days was said to be a record for 1-GW units. Crews often worked round the clock, seven days a week according to press reports.

Photograph by zpsohu (Panoramio)
Posted 23 Jul 2011

Lanxi
Location: Zhejiang
Operator: Zhejiang Energy Group Co Ltd
Configuration: 4 X 600 MW
Operation: 2006-2008
Fuel: bituminous coal
Boiler supplier: BWBC
T/G supplier: Dongfang
EPC: Zhejiang Electric Power Design Inst
Quick facts: In Jun 2004, construction started at Lanxi power plant and Unit-1 went online in Apr 2006 after 616 days of construction, a new record at the time. This facility is on an 1,800ac site in Lanxi County, Jinhua Prefecture, and was the first large-scale coal plant serving the central and western inland areas of Zhejiang. Total project investment was Rmb 10.6bn.

Photograph courtesy of Ningbo Huaye Steel Structure Co Ltd
Posted 10 Aug 2011

Ningbo FPG
Location: Zhejiang
Operator: Formosa Plastics Group
Configuration: 3 X 150 MW
Operation: 2004-2006
Fuel: coal
Boiler supplier: ??
T/G supplier: ??
EPC: Shanghai Power Erection No 2 Co
Quick facts: This is a captive power plant for a PVC resin (ethylene) works founded in May 2002.

Photograph courtesy of Shanghai Power Erection No 2 Co
Posted 17 Apr 2010

Ninghai
Location: Zhejiang
Operator: Shenhua Guohua Electric Power Corp
Configuration: 4 X 600 MW, 2 X 1,000 MW
Operation: 2005-2009
Fuel: bituminous coal
Boiler supplier: Shanghai
T/G supplier: Shanghai
EPC: Chengdu Southwest Electric Power Design Institute, Kuanghai Thermal Power Construction Co, Tianjin Electric Power Construction
Quick facts: This plant is in Ninghai town of Ningbo City. China Shenhua holds a 60% interest in Ninghai power. Unit-6 went commercial on 22 Sep 2009 followed by Unit-5 on 14 Oct 2009. These were the largest seawater natural draft cooling towers in the world at completion.

Photograph courtesy of Shenhua Guohua Electric Power Corp
Posted 17 Feb 2010

Wenzhou-2
Location: Zhejiang
Operator: China Resources Power Holdings Co
Configuration: 4 X 300 MW
Operation: 2000-2004
Fuel: bituminous coal
Boiler supplier: Shanghai
T/G supplier: ??
EPC: Zhejiang Electric Power Construction Corp
Quick facts: The plant is jointly-owned by CR Power (40%), Zhejiang Provincial Electric Power Development Co (30%) and Wenzhou Electric Power Investment Co Ltd (30%). It sells electricity into the Zhejiang grid through the East China Power Grid Co.

Photograph courtesy of China Resources Power Holdings Co
Posted 15 Feb 2004

Wushashan
Location: Zhejiang
Operator: Datang International Power Generation Co Ltd
Configuration: 4 X 600 MW
Operation: 2006
Fuel: bituminous coal
Boiler supplier: Harbin, Mitsui Babcock
T/G supplier: Harbin
EPC: Northeast China International Electric Power Corp
Quick facts: Datang Power owns a 51% stake in the plant in Ningbo City, which cost about RMB 10bn. The supercritical units have ESPs, wet FGDs from Insigma, and SCR.

Photograph courtesy of baike.baidu.com
Re-posted 28 Aug 2011

Zhenhai
Location: Zhejiang
Operator: Zhejiang Zhenhai Power Generation Co Ltd
Configuration: 4 X 215 MW
Operation: 1985-1990
Fuel: coal
Boiler supplier: Dongfang
T/G supplier: Beizhong
EPC: Zhejiang Thermal Power Construction Co
Quick facts: This site was launched in 1978 with two 125-MW oil-fired sets. These retired in 2003.

Photograph by wenjian0922 (Panoramio)
Posted 7 Aug 2011

Zheneng Liuheng
Location: Zhejiang
Operator: Zhejiang Zheneng Electric Power Co Ltd
Configuration: 2 X 1,000 MW
Operation: 2014
Fuel: coal
Boiler supplier: BWBC
T/G supplier: Dongfang
EPC: Zhejiang Electric Power Design Institute, Zhejiang Thermal Power Construction Co
Quick facts: This site is in Putuo district , on the island municipality of Zhoushan City lying across the mouth of Hangzhou Bay. Work got underway on 12 May 2011 and Unit-1 commissioned on 11 July 2014. The USC plant is said to represent China's lowest emission coal plant to date. Total investment for the two unit is about Rmb 7.89bn. The plant is controlled by Zhejiang Provincial Energy Group Co Ltd

Photograph courtesy of news.ifeng.com
Posted 30 Aug 2014

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 30-Aug-2014