Huaneng Yuhuan
Location: Zhejiang
Operator: Huaneng Power International
Configuration: 4 X 1,050 MW
Operation: 2006-2007
Fuel: coal Boiler supplier: MHI, Harbin
T/G supplier: Shanghai
EPC: East China Electrical Power Design Institute, Zhejiang Power Design Institute,
Tianjin Electric Power Construction
Quick facts: Huaneng Yuhuan is at Xiaqingtang on the southeast
coast of Zhejiang in the Damaiyu Development Zone, Yuhuan County. The
110ha site was previously farm land and beachfront. These
ultra-supercritical units have steam conditions of 263 bar with 600C
temperature and reheat. The State Council approved the plant feasibility
study in Dec 2003 and Unit-1 went commercial on 28 Nov 2006, the largest
thermal unit in China. Total plant cost at the time was estimated to be
Rmb 8.498bn. Emerson Process supplied an Ovation digital control system
for the plant, which has precipitators from Feida, and wet limestone FGD
systems from CPI Yuanda.
Photograph courtesy of China Huaneng Group
Posted 8 Nov 2009 |
Huzhou Lianshi
Location: Zhejiang
Operator: GCL-Poly Energy Holdings Ltd
Configuration: 2 X 15 MW CHP
Fuel: bituminous coal, waste coal
Operation: 2004
Boiler supplier: Wuxi Boiler Works, Tangshan Boiler Works, Jinan Boiler Works
T/G supplier: Nanjing
EPC: Zhejiang Chengjian Gas Heat Design Institute, Huzhou Construction Engineering Group
Quick facts: This plant has two CFB boilers and is in Huzhou City. The units went online in
Sep and Dec2004, respectively.
Photograph courtesy of GCL-Poly Energy Holdings Ltd
Posted 5 Jul 2010 |
Jiaxing
Location: Zhejiang
Operator: Jiaxing Power Generation Co Ltd
Configuration: 2 X 300 MW, 4 X 600 MW, 2 X 1,000 MW
Operation: 1995-2011
Fuel: bituminous coal Boiler supplier: Shanghai, BWBC, Harbin
T/G supplier: GEC-Alstom, Dongfang, Shanghai
EPC: China Power Complete Equipment, Southeast China Electric Power Design
Inst, Zhejiang Electric Power Design Inst, East China Investigation and
Design Inst, Zhejiang Electric Power
Construction Co, Zhejiang Power Co
Quick facts: In Jul and Dec 1995, respectively, two 300-MW coal-fired
units were completed at this coastal site in Jiaxing Town, Pinghu City,
about 20km west of Shanghai. Total investment in Phase I amounted to
approximately Rmb 3bn, of which 70% was contributed by Zhejiang Energy
Group Co Ltd and 30% by Zhejiang Electric Power Corp. In Jun 2001,
construction got underway on Jiaxing Phase II with four 600-MW units. The
project was invested by Zhejiang Energy Group (53%), Zhejiang Southeast
Electric Power (24%), and Shenhua Guohoa Electric Power (20%). Project
approval was received in December 2002. The first two units went into
operation in July and Dec 2004, respectively, while for Units 3&4, which
came online in May and Oct 2005, respectively, all ahead of schedule. The
second phase cost about Rmb 11bn with most of the funding being provided
by State Construction Bank and Industrial Commercial Bank of China. In Aug
2009, construction started on Jiaxing Phase III with two, 1,000-MW
ultrasupercritical, generating units. These cost about Rmb 7.89bn. Unit-1
went commercial on 23 June 2011, thereby bringing Zhejiang Energy Group’s
attributable capacity to 20 GW. The construction period of 22mos and 6
days was said to be a record for units of this size. Construction
management featured many innovative process and techniques enabling
extremely rapid erection and commissioning. Crews often worked round the
clock, seven days a week according to press reports.
Photograph by zpsohu (Panoramio)
Posted 23 Jul 2011 |
|
Lanxi
Location: Zhejiang
Operator: Zhejiang Energy Group Co Ltd
Configuration: 4 X 600 MW
Operation: 2006-2008
Fuel: bituminous coal
Boiler supplier: BWBC
T/G supplier: Dongfang
EPC: Zhejiang Electric Power Design Inst
Quick facts: In Jun 2004, construction started at Lanxi power plant and Unit-1 went online
in Apr 2006 after 616 days of construction, a new record at the time. This facility is on an 1,800ac site in
Lanxi County, Jinhua Prefecture, and was the first large-scale coal plant
serving the central and western inland areas of Zhejiang. Total project
investment was Rmb 10.6bn.
Photograph courtesy of Ningbo Huaye Steel Structure Co Ltd
Posted 10 Aug 2011 |
Ningbo FPG
Location: Zhejiang
Operator: Formosa Plastics Group
Configuration: 3 X 150 MW
Operation: 2004-2006
Fuel: coal
Boiler supplier: ??
T/G supplier: ??
EPC: Shanghai Power Erection No 2 Co
Quick facts: This is a captive power plant for a PVC resin (ethylene)
works founded in May 2002.
Photograph courtesy of Shanghai Power Erection No 2 Co
Posted 17 Apr 2010 |
Ninghai
Location: Zhejiang
Operator: Shenhua Guohua Electric Power Corp
Configuration: 4 X 600 MW, 2 X 1,000 MW
Operation: 2005-2009
Fuel: bituminous coal Boiler supplier: Shanghai
T/G supplier: Shanghai
EPC: Chengdu Southwest Electric Power Design Institute, Kuanghai Thermal
Power Construction Co, Tianjin Electric Power Construction
Quick facts: This plant is in Ninghai town of Ningbo City.
China Shenhua holds a 60% interest in Ninghai power.
Unit-6 went commercial on 22 Sep 2009 followed by Unit-5 on 14 Oct 2009.
These are the largest seawater natural draft cooling towers in the world.
Photograph courtesy of Shenhua Guohua Electric Power Corp
Posted 17 Feb 2010 |
|
Wenzhou-2
Location: Zhejiang
Operator: China Resources Power Holdings Co
Configuration: 4 X 300 MW
Operation: 2000-2004
Fuel: bituminous coal Boiler supplier: Shanghai
T/G supplier: ??
EPC: Zhejiang Electric Power Construction Corp
Quick facts: The plant is jointly-owned by CR Power (40%), Zhejiang Provincial Electric Power Development Co (30%) and Wenzhou
Electric Power Investment Co Ltd (30%). It sells electricity into the Zhejiang grid through the East China Power Grid Co.
Photograph courtesy of China Resources Power Holdings Co
Posted 15 Feb 2004 |
Wushashan
Location: Zhejiang
Operator: Datang International Power Generation Co Ltd
Configuration: 4 X 600 MW
Operation: 2006
Fuel: bituminous coal Boiler supplier: Harbin, Mitsui Babcock
T/G supplier: Harbin
EPC: Northeast China International Electric Power Corp
Quick facts: Datang Power owns a 51% stake in the plant in Ningbo City,
which cost about RMB 10bn. The supercritical units have ESPs, wet FGDs
from Insigma, and SCR.
Photograph courtesy of baike.baidu.com
Re-posted 28 Aug 2011 |
Zhenhai
Location: Zhejiang
Operator: Zhejiang Zhenhai Power Generation Co Ltd
Configuration: 4 X 215 MW
Operation: 1985-1990
Fuel: coal
Boiler supplier: Dongfang
T/G supplier: Beizhong
EPC: Zhejiang Thermal Power Construction Co
Quick facts: This site was launched in 1978 with two 125-0MW oil-fired
sets. These retired in 2003. A pair of 600-MW units are planned at Zhenhai.
Photograph by wenjian0922 (Panoramio)
Posted 7 Aug 2011 |