Coal-Fired Plants in Germany
Baden-Wurttemberg and Bayern

Altbach
Location: BW
Operator: EnBW Kraftwerke AG
Configuration: 2 X 64 MW (ret), 1 X 80 MW (ret), 1 X 200 MW, 1 X 460 MW, 1 X 348 MW
Operation: 1958-1997
Fuel: bituminous coal, natural gas
Boiler supplier: Steinmuller
T/G supplier: Siemens
EPC: Both the large sets have topping gas turbines.

Photograph courtesy of EnBW Kraftwerke AG
Posted 25 Sep 2004

GKM
Location: BW
Operator: Grosskraftwerk Mannheim AG
Configuration: 1 X 125 MW (ret), 1 X 160 MW (ret), 2 X 220 MW, 1 X 430 MW (ret), 1 X 300 MW, 1 X 475 MW, 1 X 480 MW
Operation: 1954-1993
Fuel: bituminous coal, natural gas, oil
Boiler supplier: ??
T/G supplier: ??

Photograph by Sebastian Stumpf
Posted 20 Oct 2004

Heilbron
Location: BW
Operator: EnBW Kraftwerke AG
Configuration: 2 X 65 MW (ret), 2 X 110 MW (ret), 2 X 125 MW, 1 X 760 MW
Operation: 1955-1985
Fuel: bituminous coal
Boiler supplier: KSG, VKW, Steinmuller, EVT
T/G supplier: AEG, BBC, Siemens

Photograph by Sebastian Stumpf
Posted 20 Oct 2004

RDK
Location: BW
Operator: EnBW Kraftwerke AG
Configuration: 2 X 64 MW (ret), 2 X 100 MW (ret), 2 X 180 MW, 1 X 550 MW
Operation: 1955-1985
Fuel: bituminous coal, natural gas
Boiler supplier: Steinmuller
T/G supplier: BBC

Photograph courtesy of EnBW Kraftwerke AG
Posted 25 Sep 2004

Sandreuth
Location: BY
Operator: N-ERGIE AG
Configuration: 1 X 22 MW, 2 X 45 MW, 1 X 20 MW
Operation: 1981-1992
Fuel: coal, natural gas, oil, refuse
Boiler supplier: EVT
T/G supplier: ABB

Photograph courtesy of N-ERGIE
Posted 17 Aug 2002

Schwandorf-D
Location: BY
Operator: Vattenfall Europe
Configuration: 1 X 300 MW
Operation: 1972 (ret 2002)
Fuel: lignite
Boiler supplier: Deutsche Babcock
T/G supplier: AEG, BBC

Photograph courtesy of E.ON Energie
Posted 12 Jun 2002

 

 
 

Zolling-5
Location: BY
Operator: GDF SUEZ Energie Deutschland AG
Configuration: 1 X 474 MW CHP
Operation: 1985
Fuel: hard coal
Boiler supplier: Deutsche Babcock
T/G supplier: BBC
Quick facts: Zolling was built by Isar-Amper Werke AG and the first 40-MW unit went online in 1958. Three more followed by 1966. The old untis were all demolished in 1989. The Unit-5 stack is 220m tall. This site was transferred to GDF SUEZ in 2009 as part of a swap deal with E.ON.

Photograph courtesy of GDF SUEZ
Re-posted 30 Nov 2011

 