Bakreswar
Location: West Bengal
Operator: West Bengal Power Development Corp Ltd
Configuration: 5 X 210 MW
Operation: 1999-2007
Fuel: coal Boiler supplier: BHEL
T/G supplier: Fuji, BHEL
EPC: Development Consultants Private Ltd, BHEL, Itochu, Larsen & Toubro
Ouick facts: Bakreswar TPS is 260km from Kolkata and 12km from Suri,
Birbhum Dist. Unit-1 was commissioned in
37 months and 17 days, ahead of schedule. Expansion with a 600-MW unit is planned.
Photograph courtesy of West Bengal Power Development Corp Ltd
Posted 3 Nov 2009 |
Budge Budge
Location: West Bengal
Operator: CESC Ltd
Configuration: 3 X 250 MW
Operation: 1997-2009
Fuel: coal Boiler supplier: BPL, BHEL
T/G supplier: Parsons, BHEL
EPC: Development Consultants Private Ltd, BHEL, Power Max India, Bridge & Roof Co (India) Ltd
Quick facts: This plant is in Achipur, part of Budge Budge municipality in
South 24 Parganas District.
Photograph courtesy of CESC
Posted 3 Nov 2009 |
Durgapur Phase-II
Location: Orissa
Operator: NTPC-SAIL Power Co (P) Ltd
Configuration: 2 X 60 MW
Operation: 1987-1988
Fuel: coal
Boiler supplier: Rafako
T/G supplier: Zamech, Dolmel
Quick facts: This is the second phase of a captive power plant at Durgapur
Steel Works. Operations were taken over by NTPC-SAIL power in March 2001.
Photograph courtesy of NTPC-SAIL Power Co (P) Ltd
Posted 14 Feb 2010 |
|
Kolaghat
Location: West Bengal
Operator: West Bengal Power Development Corp Ltd
Configuration: 6 X 210 MW
Operation: 1984-1993
Fuel: coal
Boiler supplier: BHEL, Combustion Engineering, ACC Vickers Babcock
T/G supplier: BHEL, Siemens
EPC: Development Consultants Private Ltd
Ouick facts: Kolaghat TPS is near Mecheda, East Midnapore Dist, and is the
largest state-owned power station in WB. The plant has retrofit ammonia-based flue gas conditioning systems.
Photograph courtesy of West Bengal Power Development Corp Ltd
Posted 3 Nov 2009 |
Mejia
Location: West Bengal
Operator: Damodar Valley Corp
Configuration: 4 X 210 MW, 2 X 250 MW, 2 X 500 MW
Operation: 1996-2011
Fuel: coal
Boiler supplier: BHEL
T/G supplier: BHEL
EPC: BHEL, Power Mech Projects Ltd
Quick facts: MTPS is both DVC's largest power station and the largest plant in West Bengal at present. The site is 35km from Durgapur City at Durlavpur in Bankura district. A 16km water pipeline was built to bring water to the site from the right bank of Damodar river. The extension units are shown under
construction. Unit-7 went to full load on 30 Jul 2010 after 36mos of constructon.
Photograph courtesy of Power Mech Projects Ltd
Posted 28 Aug 2011 |
Sagardighi
Location: West Bengal
Operator: West Bengal Power Development Corp Ltd
Configuration: 2 X 300 MW
Operation: 2008
Fuel: coal
Boiler supplier: Dongfang
T/G supplier: Dongfang
EPC: Northwest Electric Power Design Institute, Fourth Engineering Corp of
Northwest Power Construction
Ouick facts: This 1,600ac site is on the western bank of the Hooghly River in Murshidabad Dist.
The project cost Rs 2,750 crore. Several 500-MW units are to be added.
Photograph courtesy of West Bengal Power Development Corp Ltd
Posted 3 Nov 2009 |
|
Santaldih
Location: West Bengal
Operator: West Bengal Power Development Corp Ltd
Configuration: 4 X 120 MW, 1 X 250 MW
Operation: 1974-2009
Fuel: coal
Boiler supplier: BPL, ACC Vickers Babcock
T/G supplier: GEC, BHEL
EPC: BHEL
Ouick facts: Located on the right bank of Damodar River, Santaldih TPS is
in Purulia Distr. Unit-5 was built turnkey by BHEL with Mcnally Bharat extending the coal handling plant. In Mar 2007,
another 250-MW set was ordered from BHEL.
Photograph courtesy of West Bengal Power Development Corp Ltd
Posted 3 Nov 2009 |
Southern-B
Location: West Bengal
Operator: CESC Ltd
Configuration: 2 X 67.5 MW
Operation: 1990
Fuel: coal
Boiler supplier: BHEL
T/G supplier: BHEL
Photograph by Rajenda (SkyscraperCity)
Posted 3 Nov 2009 |
Titagarh
Location: West Bengal
Operator: CESC Ltd
Configuration: 4 X 60 MW
Operation: 1983-1985
Fuel: coal
Boiler supplier: ACC Vickers Babcock
T/G supplier: Parsons
Photograph by pratik (panoramio)
Posted 3 Nov 2009 |