Kozienice
Location: Mazowieckie
Operator:
Elektrownia Kozienice SA
Configuration: 8 X 215 MW, 2 X 500 MW
Operation: 1973-1979
Fuel: bituminous coal
Boiler supplier: Rafako, Deutsche Babcock
T/G supplier: Zamech, LMZ, Dolmel, Electrosila
Quick facts: Kozienice on the Vistula Rive is Poland's second largest power plant. Output
varies between 8 and 11 TWh/yr. The boilers, turbines, generators and air
pollution control equipment have been progressively upgraded from
1988-2001. The larger stack is 300m high.
Photograph courtesy of
www.elektrownie.com.pl
Posted 18 Aug 2005 |
Ostroleka B
Location: Mazowieckie
Operator: Zespol Elektrowni Ostroleka
Configuration: 3 X 200 MW
Operation: 1972
Fuel: bituminous coal
Boiler supplier: Rafako
T/G supplier: Zamech, Dolmel
Photograph courtesy of
www.elektrownie.com.pl
Posted 18 Aug 2005 |
Polaniec
Location:
Swietokrzyskie
Operator: Electrabel Polaniec SA
Configuration: 8 X 225 MW
Operation: 1979-1983
Fuel: bituminous coal
Boiler supplier: Taganrog
T/G supplier: Zamech, Dolmel, Electrosila
Quick facts: In 1998, Units 5-8 were retrofit with FGD scrubbers. In 2000
and 2003, Electrabel acquired the entire ownership of the plant from the
State Treasury. In the fall of 2004, an €8mn joint venture with forest
products group Metso Paper got underway to supply and prepare biomass for
co-combustion at Polaniec.
Photograph courtesy of
Electrabel Polaniec SA
Posted 14 Sep 2004 |
|
Pruszkow
Location: Mazowieckie
Operator: Elektrocieplownie Warszawskie SA
Configuration: 1 X 6.3 MW CHP
Operation: 1972
Fuel: bituminous coal
Boiler supplier: Babcock, Cegielski, EKM
T/G supplier: Lang, English Electric
Photograph courtesy of Vattenfall
Posted 19 Nov 2004 |
Siekierki
Location: Mazowieckie
Operator: Vattenfall Heat Poland SA
Configuration: 4 X 30 MW, 4 X 100 MW CHP
Operation: 1961-1978
Fuel: bituminous coal
Boiler supplier: Rafako
T/G supplier: Zamech, Dolmel
Quick facts:
Plant development began in 1949, but construction did not get underway
until 1958. In 1961, the plant went online and began to supply electricity
and heat to the southern part of Warsaw and the plant was extensively
modernized in the late 1990s. Total is capacity is 620 MWe and 2,014 MWt.
Photograph courtesy of Elektrocieplownie
Warszawskie SA
Posted 29 Apr 2004 |
Zeran
Location: Mazowieckie
Operator: Elektrocieplownie Warszawskie SA
Configuration: 10 X 25 MW CHP
Operation: 1954-1969
Fuel: bituminous coal
Boiler supplier: Taganrog
T/G supplier: Zamech, Dolmel, Skoda, BMZ
Quick facts:
Zeran has a total capacity of capacity is 298 MWe and 1,554 MWt. The plant
has been partially repowered with CFB boilers and has updated its
pollution control and water systems.
Photograph courtesy of Vattenfall
Posted 19 Nov 2004 |