Coal- and Lignite-Fired Plants in Russia
Northern Caucasus FD
 

 

Berezovskaya
Location: Krasnodar Krai
Operator: WGC-4
Configuration: 2 X 800 MW
Operation: 1988-1991
Fuel: lignite
Boiler supplier: Podoloski
T/G supplier: LMZ, Electrosila
Quick facts: Construction of a third unit was started, stopped, and then restarted. The third unit is scheduled for service in 2011. The site was sized for four sets altogether.

Photograph by Alexander Kuptsova
Posted 21 Nov 2001

Kanskaya
Location: Krasnodar Krai
Operator: Krasnoyarsk Generation Co
Configuration: 17 MW CHP
Operation: ??
Fuel: coal
Boiler supplier: ??
T/G supplier: ??
Quick facts: Part of TGC-13

Photograph courtesy of TGC-13
Posted 20 Sep 2006

 

Novocherkassk
Location: Rostov
Operator: Novocherkassk GRES
Configuration: 6 X 300 MW
Operation: 1965-1972
Fuel: coal, natural gas, oil
Boiler supplier: ??
T/G supplier: Kharkov
EPC: Teploelektroproekt
Quick facts: The decision to build this plant was made in 1952. The initial configuration was 3 X 100 MW, then 4 X 150 MW, and then 3 X 200 MW. Finally, the designers settled on building six 300-MW sets using supercritical technology, only the second such power station in the Soviet Union. Construction got underway in Mar 1956 and commissioning of Unit-1 began in Dec 1964. This took just over 6 months as final design and construction issues were resolved and Unit-1 went commercial on 30 Jun 1965.

Photograph courtesy of Novocherkassk GRES
Posted 28 Jun 2006

Abbreviations: CHP = combined heat and power, LMZ = Leningrad Machine Works, T/G = turbine generator, TMZ = Turbomotornyj Zavod now UTZ - Ural Turbine Works

Data: industcards, Platts UDI World Electric Power Plants Data Base