Coal-and Lignite-Fired Plants in Russia
Northern Caucasus FD

Berezovskaya
Location: Krasnodar Krai
Operator: E.ON Russia
Configuration: 2 X 800 MW
Operation: 1988-1991
Fuel: lignite
Boiler supplier: Podoloski
T/G supplier: LMZ, Electrosila
Quick facts: Construction of a third unit was started, stopped, and then restarted. The third unit is scheduled for service in 2014. The site was sized for four sets altogether. The stack is 370m, the tallest in Russia.

Photograph by Alexander Kuptsova
Posted 21 Nov 2001

Kanskaya
Location: Krasnodar Krai
Operator: TGK-13
Configuration: 12 MW CHP
Operation: ??
Fuel: coal
Boiler supplier: ??
T/G supplier: ??
Quick facts: Part of TGC-13

Photograph courtesy of TGC-13
Posted 20 Sep 2006

Novocherkassk
Location: Rostov
Operator: OGK-6
Configuration: 6 X 300 MW
Operation: 1965-1972
Fuel: coal, natural gas, oil
Boiler supplier: Taganrog
T/G supplier: Kharkov
EPC: SEP-Electric
Quick facts: The decision to build this plant was made in 1952. The initial configuration was 3 X 100 MW, then 4 X 150 MW, and then 3 X 200 MW. Finally, the designers settled on building six 300-MW sets using supercritical technology, only the second such power station in the Soviet Union. Construction got underway in Mar 1956 and commissioning of Unit-1 began in Dec 1964. This took just over 6 months as final design and construction issues were resolved and Unit-1 went commercial on 30 Jun 1965.

Photograph courtesy of Novocherkassk GRES
Posted 28 Jun 2006