Algeciras
Location: Cadiz
Operator: Enel Viesgo
Configuration: 1 X 220 MW, 1 X 533 MW
Operation: 1970-1975
Fuel: coal, natural gas, oil
Boiler supplier: Stein, B&W Espanola
T/G supplier: Alsthom, WH
Photograph courtesy of Enel Viesgo
Posted 3 Jun 2005 |
Anllares
Location: Leon
Operator: Union Fenosa
Configuration: 1 X 350 MW
Operation: 1982
Fuel: anthracite, bituminous coal
Boiler supplier: GDV
T/G supplier: MHI
Photograph courtesy of Union Fenosa
Posted 11 Aug 2004 |
As Pontes
Location: La Coruna
Operator: Endesa
Configuration: 4 X 350 MW
Operation: 1976-1979
Fuel: lignite, subbituminous coal
Boiler supplier: GDV
T/G supplier: MHI, WH
Quick facts: With local lignite reserves declining, the Pontes plant is
being gradually converted to running on imported coal only. The 356m stack
has a base diameter of 36m and tapers to 18m at the top. At completion, it
was the world's largest stack by volume.
Photograph courtesy of
Endesa
Posted 5 Jun 2005 |
|
Cercs
Location: Barcelona
Operator: Enel Viesgo
Configuration: 1 X 160 MW
Operation: 1971
Fuel: lignite
Boiler supplier: Deutsche Babcock
T/G supplier: Siemens
Photograph courtesy of Enel Viesgo
Posted 3 Jun 2005 |
Compostilla II
Location: Leon
Operator: Endesa
Configuration: 2 X 141 MW, 1 X 330 MW, 2 X 350 MW
Operation: 1961-1984
Fuel: anthracite, bituminous coal
Boiler supplier: GDV
T/G supplier: WH, MHI
Quick facts: The first generating units at Compostilla I went online in
1945. The Unit-3 T/G set was MHI's first major power equipment sale into
Spain. In May 2005, Endesa contracted with Inerco to install new
combustion control systems at Compostilla and in Jan 2006, MHI received
orders for FGD systems for Units 4&5. MHI and Duro Felguera will install
the FGD equipment by 2008.
Photograph courtesy of
Endesa
Posted 22 Jun 2006 |
Escatron-5
Location: Zaragoza
Operator: Enel Viesgo
Configuration: 1 X 80 MW
Operation: 1990
Fuel: lignite
Boiler supplier: ASEA, B&W Espanola
T/G supplier: ??
Quick facts: This is one of only a handful of pressurized fluidized-bed
combustion units in the world.
The plant uses a 63-MW PFBC boiler and a 17-MW gas turbine. The local
lignite has 5% sulphur and about 25% ash.
Photograph courtesy of Enel Viesgo
Posted 3 Jun 2005 |
|
Meirama
Location: Spain
Operator: Union Fenosa
Configuration: 1 X 553 MW
Operation: 1980
Fuel: bituminous coal, lignite
Boiler supplier: Deutsche Babcock
T/G supplier: BBC
Photograph courtesy of Union Fenosa
Posted 11 Aug 2004 |
Robla
Location: Spain
Operator: Union Fenosa
Configuration: 1 X 270 MW, 1 X 350 MW
Operation: 1971-1984
Fuel: anthracite, bituminous coal
Boiler supplier: FW, Deutsche Babcock
T/G supplier: BBC, Siemens
Photograph courtesy of Union Fenosa
Posted 11 Aug 2004 |
Puente Nuevo-3
Location: Cordoba
Operator: Enel Viesgo
Configuration: 1 X 324 MW
Operation: 1980
Fuel: bituminous coal, anthracite, oil
Boiler supplier: GDV
T/G supplier: BBC
Photograph courtesy of Enel Viesgo
Posted 4 Jun 2005 |