Coal-Fired Power Plants in the USA
Arizona, California & New Mexico

 

Ace Cogen
Location:
CA

Operator: Ace Cogen Trona Operating Partners
Configuration: 1 X 108 MW CHP
Operation: 1990
Fuel: bituminous coal, petroleum coke, TDF
Boiler supplier: Foster Wheeler
T/G supplier: Hitachi, MHI
EPC: Black & Veatch
Quick facts: This CFB unit largest coal-fired cogeneration facility in the state. It is a Qualifying Facility with an agreement to supply power to Southern California Edison until Nov 2015. Steam is supplied to two North American Chemical Co soda ash plants adjacent to the site.

Photograph courtesy of Foster Wheeler
Posted 27 Nov 2005

Coronado
Location: AZ
Operator: Salt River Project
Configuration: 2 X 410 MW
Operation: 1979-1980
Fuel: subbituminous coal
Boiler supplier: Riley Stoker
T/G supplier: GE
EPC: Bechtel

Photograph courtesy of Salt River Project
Posted 17 Jan 2001

 

Mount Poso
Location: CA

Operator: Northern Star Generation LLC
Configuration: 1 X 62 MW
Operation: 1989
Fuel: bituminous coal, petroleum coke, TDF
Boiler supplier: Foster Wheeler
T/G supplier: GEC-Alstom
EPC: Bechtel
Quick facts: This cogeneration plant was originally built by Mt Poso Cogeneration Co, a joint venture of Ahlstrom Development Corp, Pacific Generation Co, and Bechtel Enterprises. The facility provides steam for enhanced oil recovery at the Mt. Poso Field-West and was originally built as a baseload cogen plant under PURPA but deregulation in California starting in 1998 moved it to a cycling merchant-plant business model.

Photograph courtesy of Foster Wheeler
Posted 27 Nov 2005

Plains Escalante
Location: NM
Operator: Tri-State G&T Coop
Configuration: 1 X 233 MW
Operation: 1984
Fuel: coal
Boiler supplier: CE
T/G supplier: GE
Quick facts: Construction on Escalante started in 1984 and the plant cost $450mn. Fuel is delivered by rail from Peabody’s Lee Ranch Mine.

Photograph courtesy of Tri-State G&T Association Inc
Posted 9 Jan 2002

San Juan
Location: NM
Operator: Public Service New Mexico
Configuration: 2 X 360 MW, 2 X 544 MW
Operation: 1973-1982
Fuel: subbituminous coal
Boiler supplier: B&W, FW
T/G supplier: GE, Westinghouse
Quick facts: San Juan is operated by PNM on behalf of nine Western utility owners including investor-owned companies, coops, and public power companies.

Photograph courtesy of Public Service New Mexico
Posted 24 Jan 2002

Springerville
Location: AZ
Operator: Tucson Electric Power Co
Configuration: 2 X 425 MW, 1 X 420 MW
Operation: 1985-2006
Fuel: subbituminous coal
Boiler supplier: CE, FW
T/G supplier: BBC, MHI, Melco
EPC: Bechtel, Brown & Root
Quick facts:
The plant was originally designed by Bechtel Power to have four units and a new 400-MW block has just been completed at a cost of about $850mn including $90mn in upgrades to the FGDs and burner systems of Units 1&2. Unit-3 has SCR and dry FGD scrubbers. Fuel is from Peabody’s Lee Ranch Mine.

Photograph courtesy of Bechtel Power
Re-posted 14 Oct 2006

Abbreviations: BBC = Brown Boveri, B&W = Babcock & Wilcox, CE = Combustion Engineering, FW = Foster Wheeler, GE = General Electric, Melco = Mitsubishi Electric, MHI = Mitsubishi Heavy Industries, TDF = tire derived fuel, T/G = turbine generator

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 12/29/06

Home