Azerbaijanskaya
Location: Azerbaijan
Operator: Azerenerji
Configuration: 8 X 300 MW
Fuel: natural gas
Operation: 1981-1991
Boiler supplier: Taganrog
T/G supplier: LMZ, Electrosila
Photograph courtesy of
Energomachexport
Posted 25 Oct 2002 |
Gardabani
Location: Georgia
Operator: Tbilsresi
Configuration: 1 X 130 MW, 5 X 142 MW
Fuel: natural gas
Operation: 1981-1991
Boiler supplier: Taganrog
T/G supplier: LMZ, Electrosila
Quick facts: This is the largest thermal plant in Georgia but only three
units run regularly. The Mtkvari power
station shares the site.
Photograph courtesy of
Ministry of Energy
Posted 4 Nov 2006 |
MAEK-3
Location: Kazakhstan
Operator: MAEK-Kazatomprom LLP
Configuration: 3 X 210 MW
Fuel: natural gas
Operation: 1983-1990
Boiler supplier: Taganrog
T/G supplier: LMZ, SE Plant Electrotyazhmash
Quick facts: MAEK-Kazatomprom resulted from the acquisition of the
former Mangistauski Nuclear Power Combine (MAEK) which includes three
thermal power stations, the retired NPP, and a desalination plant along
with related equipment and installations. The company is a 100% subsidiary of Kazatomprom and supplies heat, electricity, and potable water for
the Aktau and Mangistau regions.
Photograph courtesy of MAEK-Kazatomprom LLP
Posted 10 Jun 2009 |
|
Mtkvari
Location: Georgia
Operator: Telasi JSC
Configuration: 2 X 300 MW
Fuel: natural gas, oil
Operation: 1989-1994
Boiler supplier: Taganrog
T/G supplier: LMZ, Electrosila
Quick facts: This two supercritical sets are the largest steam-electric
units in Georgia. One set was
seriously damaged by accident in Dec 2001 and was deactivated for a time and the
second ran for years derated.
Photograph courtesy of Inter RAO
Posted 23 Jan 2011 |
Syrdarya
Location: Uzbekistan
Operator: Uzbekenergo
Configuration: 10 X 300 MW
Fuel: natural gas, oil
Operation: 1972-1981
Boiler supplier: Taganrog
T/G supplier: LMZ, Electrosila
Quick facts: The tallest stack is 350m high.
Photograph courtesy of U.S. Foreign
Commercial Service, Tashkent
Posted 25 Jul 2001 |
Tolimarjon
Location: Uzbekistan
Operator: Uzbekenergo
Configuration: 1 X 800 MW
Fuel: natural gas, oil
Operation: 2004
Boiler supplier: Taganrog
T/G supplier: LMZ, Electrosila
EPC: Energomaschinostroitelnaya Korporaziya, Kvartz Vostochnaya Sibir
Quick facts: This supercritical set is essentially the last of a string
of 800-MW machines supplied by LMZ. Four
units were planned for the site on the KMK Canal when development started
in 1984. Construction stalled for
a time after the collapse of the Soviet Union and restarted in 1994. Kvartz came on the job in 1998 and a second unit was started.
It may not be completed. Future additions at Tolimarjon are likely to be CCGT
plants. Two
450-MW blocks were tendered in Nov 2010.
Photograph courtesy of Kvartz Vostochnaya Sibir
Posted 20 Nov 2010 |