Negotino
Location: Macedonia
Operator: AD TPP Negotino
Configuration: 1 X 210 MW
Operation: 1978
Fuel: heavy oil, natural gas Boiler supplier: Podoloski
T/G supplier: TPE
Quick facts: This plant is on the Vardar River 8km downstream from Negotino town.
It has generally been used infrequently,
although it is a valuable reserve for dry-year conditions. Site support
infrastructure was built out for a second unit and overall site capacity
could be as much as 1,000 MW. In 2005, the plant was spun out of
Macedonia's state power company ESM and put up for sale.
Photograph courtesy of AD
TPP Negotino
Posted 27 May 2006 |
|
Novi Sad
Location: Serbia
Operator: Elektroprivreda Srbije (EPS)
Configuration: 1 X 135 MW, 1 X 110 MW CHP
Operation: 1981-1984
Fuel: heavy oil, natural gas
Boiler supplier: Taganrog
T/G supplier: TMZ, Koncar
EPC: Elektroproject
Photograph courtesy of EPS
Posted 28 Oct 2006
|