Gas- and Oil-Fired Steam-Electric Plants in Japan - Hokkaido
Date
Location: Hokkaido
Operator: Hokkaido Electric Power Co
Configuration: 2 X 350 MW
Fuel: HFO
Operation: 1978-1980
Boiler supplier: MHI, IHI
T/G supplier: Hitachi, Toshiba
Quick facts: Date is on Uchiura Bay along the far southeast coast of Hoakkaido.The units commissioned in Nov 1978 and Mar 1980, respectively. Heavy oil is delivered to the site from the Muroran transfer station

Photograph courtesy of Hokkaido Electric Power Co
Posted 24 May 2014

Shiriuchi
Location: Hokkaido
Operator: Hokkaido Electric Power Co
Configuration: 2 X 350 MW
Fuel: HFO
Operation: 1983-1998
Boiler supplier: MHI, IHI
T/G supplier: Hitachi, Toshiba
EPC: TDKL, Obayashi
Quick facts: Shiriuchi PS is at the far southern tip of Hokkaido. The units commissioned in Dec 1983 and Sep 1998, respectively. Unit-2 was desgined for and fired Orimulsion for a time.

Photograph courtesy of Hokkaido Electric Power Co
Posted 24 May 2014

Tomakomai
Location: Hokkaido
Operator: Hokkaido Electric Power Co
Configuration: 3 X 250 MW
Fuel: HFO
Operation: 1971-1973
Boiler supplier: Babcock-Hitachi,, IHI
T/G supplier: Hitachi, Toshiba
EPC: Taihei Dengyo Kaisha
Quick facts: Units 1&2 at this PS were built by Tomakomai Kyodo Power Co, a captive genco for a local aluminim smelting operation and a JV of Hokkaido EPC and Nippon Light Metal Co Ltd. Unit-3 was buit by the utility. When the smelter closed down, all the electricity was sold to Hokkaido EPC. Units 1&2 are retired. The stack is 170m tall.

Photograph courtesy of Hokkaido Electric Power Co
Posted 24 May 2014