Gas- and Oil-fired Plants in the USA - Texas - A to L
Collin
Location: TX
Operator: TXU
Configuration: 1 X 156 MW
Operation: 1955 (ret)
Fuel: natural gas, oil
Boiler supplier: CE
T/G supplier: GE

Photograph courtesy of TXU
Posted 21 Sep 2004

Dansby
Location: TX
Operator: Bryan Texas Utilities
Configuration: 1 X 110 MW
Operation: 1978
Fuel: natural gas, oil
Boiler supplier: B&W
T/G supplier: GE
EPC: Lutz Daily & Brain
Quick facts: The Roland C Dansby plant is 5mi north of the Bryan city limits

Photograph courtesy of Lutz Daily & Brain
Posted 8 May 2016

Decker
Location: TX
Operator: Austin Energy
Configuration: 1 X 321 MW, 1 X 405 MW
Operation: 1972-1977
Fuel: natural gas
Boiler supplier: CE
T/G supplier: WH
EPC: Brown & Root, Bovay, Burns & McDonnell, JM Odom

Photograph courtesy of Austin Energy
Posted 29 Sep 2004

Decordova
Location: TX
Operator: TXU
Configuration: 1 X 800 MW
Operation: 1975 (ret)
Fuel: natural gas
Boiler supplier: B&W
T/G supplier: GE
EPC: Gibbs & Hill, Zachry
Quick facts: This supercritical unit in Hood Co ran 28yrs without a lost-time injury.

Photograph courtesy of TXU
Posted 21 Sep 2004

Eagle Mountain
Location: TX
Operator: TXU
Configuration: 1 X 122 MW, 1 X 188 MW, 1 X 396 MW
Operation: 1954-1971 (ret)
Fuel: natural gas
Boiler supplier: B&W, RS, FW
T/G supplier: GE

Photograph courtesy of TXU
Posted 21 Sep 2004

East Plant
Location: TX
Operator: Southwestern Public Service Co
Configuration: 2 X 5 MW, 2 X 12.5 MW
Operation: 1927-1942 (ret)
Fuel: natural gas
Boiler supplier: B&W
T/G supplier: GE
Quick facts: East Plant is shown in the 1920s at its site off of what is now East Amarillo Blvd. Units 1&2 were closed in 1975 and Units 3&4 in 1980. SPS maintains a substation at the site.

Photograph courtesy of amarillo.com
Posted 1 Jun 2014

Graham
Location: TX
Operator: Luminant
Configuration: 1 X 248 MW, 1 X 387 MW
Operation: 1960-1969
Fuel: natural gas
Boiler supplier: FW, RS
T/G supplier: AC, GE
EPC: Ebasco
Quick facts: In Dec 2010, Graham celebrated 50yrs of operation. In that time, the plant generated over 136 TWh. The plant staff went 26yrs without a lost-time injury. The site is 125mi west of Dallas.

Photograph courtesy of Luminant
Re-posted 31 May 2013

Handley
Location: TX
Operator: Exelon Power
Configuration: 1 X 44 MW (ret), 1 X 75 MW (ret), 1 X 405 MW, 2 X 455 MW
Operation: 1948-1977
Fuel: natural gas
Boiler supplier: B&W, CE, FW, RS
T/G supplier: ACPS, GE, WH
EPC: Ebasco, UE&C, Gibbs & Hill, Austin Constructors
Quick facts: In 1902, Northern Texas Traction Co built a generating plant at Handley, the largest in the area, along Lake Erie. Now known as Lake Arlington, the lake is popular recreation destination. Handley-1 was the first outdoor steam electric plant of its type in the industry. The Handley plant was acquired from TXU in Apr 2002. In May 2003, SCRs were installed on Units 4&5 and on Unit-3 in 2004.

Photograph courtesy of TXU
Posted 15 Jan 2001

Holly Street
Location: TX
Operator: Austin Energy
Configuration: 2 X 100 MW, 1 X 165 MW, 1 X 193 MW
Operation: 1960-1974 (ret 2004-2007)
Fuel: natural gas
Boiler supplier: CE, B&W
T/G supplier: WH, GE
EPC: Brown & Root, JM Odom, Zachry
Quick facts: Holly Street 3&4 were retired at midnight on 30 Sep 2007 and Units 1&2 were retired in Oct 2004. In Dec 2011, TRC Cos was hired for the $11.5mn, 18mo plant demolition. Acreage fronting and adjacent to the lake converted to parkland. For about a year, Austin Energy met monthly with a Holly Neighborhood Closure Committee to keep residents informed about closure and decommissioning plans. When fully operational, Holly Street had about 50 employees.

Photograph courtesy of Austin Energy
Posted 29 Sep 2004

Jones
Location: TX
Operator: Southwestern Public Service Co
Configuration: 2 X 243 MW
Operation: 1971-1974
Fuel: natural gas, fuel oil
Boiler supplier: CE
T/G supplier: WH
EPC: SPS, Missouri Valley Inc
Quick facts: Jones PS is sited southwest of Lubbock and is Xcel's largest natural gas power plant in the Texas area. It was named for Clifford B Jones, past president of Texas Tech University and a local rancher. Cooling and process water is treated wastewaer from the City of Lubbock system. The plant also has two 169-MW gas turbines.

Photograph courtesy of Xcel Energy
Posted 1 Jun 2014

Lake Creek 2&3
Location: TX
Operator: TXU
Configuration: 1 X 80 MW, 1 X 236 MW
Operation: 1953-1959 (ret)
Fuel: natural gas, oil
Boiler supplier: CE, FW
T/G supplier: GE, WH
Quick facts: Three 2-MW General Motors diesel gensets were added to the plant in 1966. Unit-2 is deactivated.

Photograph courtesy of TXU
Posted 22 Sep 2004

Lake Hubbard
Location: TX
Operator: Luminant
Configuration: 1 X 397 MW, 1 X 531 MW
Operation: 1970-1973
Fuel: natural gas, oil
Boiler supplier: B&W
T/G supplier: WH, GE
Quick facts: Unit-1 construction began Nov 1967 and it went commercial on 8 Jun 1970. Unit-2 started construction in Jun 1971 and began operations on 20 Nov 1973. Lake Hubbard received the Fluor Corp Hugh K Coble Award for Project Excellence for the plant's SCR retrofit program.

Photograph courtesy of TXU
Posted 22 Sep 2004

 
Leon Creek
Location: TX
Operator: CPS Energy
Configuration: 2 X 31 MW (ret), 1 X 75 MW, 1 X 114 MW conventional steam, 4 X 50-MW LM6000 gas turbines
Fuel: natural gas, oil
Operation: 1949-1959 (steam), 2004 (GT)
Boiler supplier: B&W
T/G supplier: WH, GE
EPC: Gibbs & Hll, UTEC, TIC
Quick facts: Leon Creek was the first new power station built by City Public Service after it acquired San Antonio Public Service Company (SAPSCo) in 1942.

Photograph courtesy of CPS Energy
Posted 4 Mar 2011

Lewis Creek
Location: TX
Operator: Entergy Texas
Configuration: 2 X 271 MW
Fuel: natural gas
Operation: 1970-1971
Boiler supplier: B&W
T/G supplier: WH
EPC: Brown & Root
Quick facts: This PS is near Willis, Montgomery Co. A 1,100ac cooling reservoir was built with the steam-electric plant. This impoundd Lews Creek, a tributary of the west fork of the San Jacinto River.

Photograph courtesy of Entergy
Posted 21 Dec 2016

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 21-Dec-2016