Gas- and Oil-Fired Plants in Uzbekistan
Navoi
Location: Uzbekistan
Operator: Uzbekenergo
Configuration: 2 X 50 MW, 1 X 60 MW, 4 X 160 MW, 2 X 210 MW
Fuel: natural gas, oil
Operation: 1962-1980
Boiler supplier: Taganrog
T/G supplier: Kharkov, LMZ, Electrosila, SE Plant Electrotyazhmash

Photograph courtesy of Uzbekenergo
Posted 27 Mar 2013

Syrdarya
Location: Uzbekistan
Operator: Uzbekenergo
Configuration: 10 X 300 MW
Fuel: natural gas, oil
Operation: 1972-1981
Boiler supplier: Taganrog
T/G supplier: LMZ, Electrosila
EPC: Uzbekgidroenergostroy
Quick facts: The tallest stack is 350m high.

Photograph courtesy of U.S. Foreign Commercial Service, Tashkent
Posted 25 Jul 2001

Takhiatash
Location: Uzbekistan
Operator: Uzbekenergo
Configuration: 3 X 100 MW, 2 X 200 MW
Fuel: natural gas
Operation: 1966-1989
Boiler supplier: Taganrog
T/G supplier: Kharkov, LMZ, Electrosila, SE Plant Electrotyazhmash
EPC: Uzbekgidroenergostroy

Photograph courtesy of Uzbekenergo
Posted 27 Mar 2013

Tashkent GRES
Location: Uzbekistan
Operator: Uzbekenergo
Configuration: 12 X 150 MW CHP
Fuel: natural gas, oil
Operation: 1963-1971
Boiler supplier: Taganrog
T/G supplier: Kharkov, Electrosila
EPC: Uzbekgidroenergostroy
Quick facts: This TPP is in Kibray district of Tashkent region, 15km northeast of the capital.

Photograph courtesy of Uzbekenergo
Posted 27 Mar 2013

Tashkent TPP
Location: Uzbekistan
Operator: Uzbekenergo
Configuration: 1 X 22.5 MW CHP
Fuel: natural gas, oil
Operation: 1939
Boiler supplier: ??
T/G supplier: ??

Photograph courtesy of Uzbekenergo
Posted 27 Mar 2013

Tolimarjon
Location: Uzbekistan
Operator: Uzbekenergo
Configuration: 1 X 800 MW
Fuel: natural gas, oil
Operation: 2004
Boiler supplier: Taganrog
T/G supplier: LMZ, Electrosila
EPC: Energomaschinostroitelnaya Korporaziya, Kvartz Vostochnaya Sibir, Uzbekgidroenergostroy
Quick facts: This supercritical set was essentially the last of a string of 800-MW machines supplied by LMZ. Four units were planned for the site on the KMK Canal when development started in 1984. Construction stalled for a time after the collapse of the Soviet Union and restarted in 1994. Kvartz came on the job in 1998 and a second unit was started, although this will apparently not complete. The stack is 273m tall. The next additions at Tolimarjon are two 450-MW CCGT blocks tendered in Nov 2010 and awarded in 2013.

Photograph courtesy of Uzbekenergo
Re-posted 27 Mar 2013