Wind Energy Power Plants in Australia

 

Challicum Hills
Location: VIC
Operator: Pacific Hydro
Configuration: 35 X 1.5-MW NM64C
Operation: 2003
WTG supplier: Micon

Photograph courtesy of Pacific Hydro
Posted 4 Jun 2004

Codrington
Location: VIC
Operator: Pacific Hydro
Configuration: 14 X 1.3-MW Model 62
Operation: 2001
WTG supplier: Bonus

Photograph courtesy of Pacific Hydro
Posted 4 Jun 2004

Crookwell
Location: NSW
Operator: Country Energy
Configuration: 8 X 600-kW V44
Operation: 1998
WTG supplier: Vestas

Photograph courtesy of Eraring Energy
Posted 27 Dec 2001

Cullerin Range
Location: NSW
Operator: Origin Energy Ltd
Configuration: 15 X 2-MW MM82
Operation: 2009
WTG supplier: REPower
EPC: Prince Keppel
Quick facts: In Jan 2008, Origin acquired the development rights for Cullerin from Epuron and it is the company's first self-built wind project. Cullerin is 30km west of Goulbun and is connected to Country Energy's 132kV Goubburn-Yass line. The project coast A$95mn.

Photograph courtesy of Origin Energy
Posted 2 Sep 2009

Starfish Hill
Location: SA
Operator: Tarong Energy Corp Ltd
Configuration: 23 X 1.5-MW
Operation: 2003
WTG supplier: Micon
EPC: Micon
Quick facts: This was South Australia's first large-scale wind farm.

Photograph courtesy of Tarong Energy
Posted 3 Nov 2004

 

Studland Bay
Location: TAS
Operator: Roaring 40s Renewable Energy Pty Ltd
Configuration: 25 X 3-MW V90
Operation: 2007
WTG supplier: Vestas
Quick facts: In Nov 2005, Roaring 40s ordered the first V90, 3-MW machines in Australia for the Studland Bay project. This is the third phase of the Woolnorth scheme.

Photograph courtesy of Roaring 40s Renewable Energy Pty Ltd
Posted 20 Jan 2011

Toora
Location: QLD
Operator: Stanwell Corp
Configuration: 12 X 1.75-MW V66
Operation: 2002
WTG supplier: Vestas

Photograph courtesy of Stanwell Corp
Posted 20 Oct 2004

 

Windyhill
Location: QLD
Operator: Stanwell Corp
Configuration: 20 X 660-kW E-40
Operation: 2000
WTG supplier: Enercon
EPC: Powercorp Operations
Quick facts: This wind farm is located 3km from Ravenshoe, which is situated at 920m elevation and is the highest town in Queensland. The site is privately-owned Atherton Tableland dairy farmland. The project included an underground 22kV electrical reticulation system, SCADA system, and wind monitoring equipment. The turbines are installed on 44m, 2-piece tubular steel towers and fitted with 22m blades. At completion Windyhill was one of the largest wind plants yet built in subtropical territory.

Photograph courtesy of Stanwell Corp
Posted 10 Nov 2001

Woolnorth-I
Location: TAS
Operator: Hydro Tasmania
Configuration: 6 X 1.75-MW V66
Operation: 2002
WTG supplier: Vestas
Quick facts: The wind farm site is on historic grazing property on Cape Grim on Woolnorth's rugged Tasmanian west coast. This area is reputed to have the cleanest air in the world. The Phase I plant went online in Aug 2002 and included a 22kV line to Smithton. Hydro Tasmania is supporting conservation and management of the endangered orange-bellied parrot which is found in the area.

Photograph courtesy of Hydro Tasmania
Posted 25 Jan  2004

 

Wonthaggi
Location: VIC
Operator: Wind Power Pty Ltd
Configuration: 6 X 2-MW MM82
Operation: 2006
WTG supplier: Repower Systems
Quick facts: The site is 3km from Wonthaggi Town center in Bass Shire, Gippsland. The turbines are built on 120ac of grazing land which traverses land behind sand dunes and a foreshore reserve.

Photograph courtesy of Wind Power Pty Ltd
Posted 20 Jan  2007

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 01/20/11

Home