Wind Energy Power Plants in Australia
|
|
|
|
|
Challicum Hills Location: VIC Operator: Pacific Hydro Configuration: 35 X 1.5-MW NM64C Operation: 2003 WTG supplier: Micon Photograph courtesy of Pacific
Hydro |
Codrington Location: VIC Operator: Pacific Hydro Configuration: 14 X 1.3-MW Model 62 Operation: 2001 WTG supplier: Bonus Photograph courtesy of Pacific
Hydro |
Crookwell Location: NSW Operator: Country Energy Configuration: 8 X 600-kW V44 Operation: 1998 WTG supplier: Vestas Photograph courtesy of Eraring Energy |
![]() |
![]() |
![]() |
|
Cullerin Range Location: NSW Operator: Origin Energy Ltd Configuration: 15 X 2-MW MM82 Operation: 2009 WTG supplier: REPower EPC: Prince Keppel Quick facts: In Jan 2008, Origin acquired the development rights for Cullerin from Epuron and it is the company's first self-built wind project. Cullerin is 30km west of Goulbun and is connected to Country Energy's 132kV Goubburn-Yass line. The project coast A$95mn.
Photograph courtesy of
Origin Energy |
Starfish Hill Location: SA Operator: Tarong Energy Corp Ltd Configuration: 23 X 1.5-MW Operation: 2003 WTG supplier: Micon EPC: Micon Quick facts: This was South Australia's first large-scale wind farm.
Photograph courtesy of
Tarong Energy
|
Studland Bay Location: TAS Operator: Roaring 40s Renewable Energy Pty Ltd Configuration: 25 X 3-MW V90 Operation: 2007 WTG supplier: Vestas Quick facts: In Nov 2005, Roaring 40s ordered the first V90, 3-MW machines in Australia for the Studland Bay project. This is the third phase of the Woolnorth scheme. Photograph courtesy of Roaring 40s Renewable Energy Pty Ltd |
![]() |
![]() |
![]() |
|
Toora Location: QLD Operator: Stanwell Corp Configuration: 12 X 1.75-MW V66 Operation: 2002 WTG supplier: Vestas
Photograph courtesy of Stanwell Corp
|
Windyhill Location: QLD Operator: Stanwell Corp Configuration: 20 X 660-kW E-40 Operation: 2000 WTG supplier: Enercon EPC: Powercorp Operations Quick facts: This wind farm is located 3km from Ravenshoe, which is situated at 920m elevation and is the highest town in Queensland. The site is privately-owned Atherton Tableland dairy farmland. The project included an underground 22kV electrical reticulation system, SCADA system, and wind monitoring equipment. The turbines are installed on 44m, 2-piece tubular steel towers and fitted with 22m blades. At completion Windyhill was one of the largest wind plants yet built in subtropical territory.
Photograph courtesy of Stanwell Corp |
Woolnorth-I Location: TAS Operator: Hydro Tasmania Configuration: 6 X 1.75-MW V66 Operation: 2002 WTG supplier: Vestas Quick facts: The wind farm site is on historic grazing property on Cape Grim on Woolnorth's rugged Tasmanian west coast. This area is reputed to have the cleanest air in the world. The Phase I plant went online in Aug 2002 and included a 22kV line to Smithton. Hydro Tasmania is supporting conservation and management of the endangered orange-bellied parrot which is found in the area.
Photograph courtesy of Hydro Tasmania
|
![]() |
||
|
Wonthaggi Location: VIC Operator: Wind Power Pty Ltd Configuration: 6 X 2-MW MM82 Operation: 2006 WTG supplier: Repower Systems Quick facts: The site is 3km from Wonthaggi Town center in Bass Shire, Gippsland. The turbines are built on 120ac of grazing land which traverses land behind sand dunes and a foreshore reserve.
Photograph courtesy of Wind Power Pty Ltd |
||
![]() |
||
Data: industcards, Platts UDI World Electric Power Plants Data Base