Wind Energy Power Plants Elsewhere
|
|
|
|
|
Ascension Island Photograph courtesy of Idaho National
Laboratory |
Butoni Location: Fiji Operator: Fiji Electricity Authority Configuration: 37 X 275 kW GEV MP/275 Operation: 2007 WTG supplier: Vergnet EPC: Vergnet Quick facts: Butoni is in a area of low to moderate wind spedds, averaging 5.46 m/s. The site is a narrow, north-south ridge about 5km from Sigatoka town. The WTGs can be lowered and re-erected quickly in case of cyclones. The FJ$34mn plant is expected to save FEA about FJ$3mn/yr and reduce diesel consumption by about 2,5000mt/yr.
Photograph courtesy of Fiji Electricity Authority |
Mawson Station
Photograph courtesy of Australian Business Council for Sustainable Energy |
![]() |
![]() |
![]() |
|
Princess Elisabeth Station
Photograph courtesy of Proven Energy |
Pushkin Pass Location: Armenia Operator: Settlement Centre CJSC Configuration: 4 X 660 kW S47 Operation: 2005 WTG supplier: Saba Niroo, Sadid EPC: Moshanir Quick facts: This plant was inaugurated on 17 Dec 2005 at a site at 2000m elevation near Gargar village It is Iran's first-ever wind plant export and was built with a $3.5mn grant from the Iranian government. Most power is used by the nearby town of Stepanavan.
Photograph courtesy of Saba Niroo |
Touongo Location: New Caledonia Operator: Aerowatt Configuration: 18 X 275 kW GEV MP/275 Operation: 2010 WTG supplier: Vergnet EPC: Vergnet Quick facts: This project is 95% owned by Aerowatt.
Photograph courtesy of Aerowatt |
Data: industcards, Platts UDI World Electric Power Plants Data Base