Wind Energy Power Plants in Germany
 

Bremerhaven
Location: HB
Operator: PROKON Nord Energiesysteme GmbH
Configuration: 1 X 5 MW M5000
Operation: 2004
WTG supplier: Multibrid
Quick facts: This is the first prototype of the 5-MW Multibrid machine designed specifically for offshore applications. The integrated design includes a single- stage planetary gearbox as well as a permanent magnet generator. This gives a very low top-head weight for such a large wind turbine

Photograph courtesy of Multibrid Entwicklungsgesellschaft mbH
Posted 10 Jun 2006

Hocheifel
Location: RP
Operator:
Windpark Hocheifel
Configuration: 10
X 1-MW D6
Operation: 2000
WTG supplier: DeWind

Photograph courtesy of Umweltkontor AG
Posted 28 Apr 2004

 

Holzhausen
Location: HE
Operator: WestWind Verwaltungs GmbH & Co KG
Configuration: 15 X 2.0-MW E70/E4
Operation: 2005
WTG supplier: Enercon

Photograph courtesy of WestWind
Posted 28 May 2007

 

Ochtrup
Location: NW
Operator: Global Wind Power A/S
Configuration: 2 X 2-MW V80
Operation: 2002
WTG supplier: Vestas

Photograph courtesy of Global Wind Power A/S
Posted 5 Feb 2006

Pollenfeld
Location: BY
Operator:
Windpark Pollenfeld KG
Configuration: 2
X 1.5-MW
Operation: 2005
WTG supplier: Vestas

Photograph courtesy of Vestas
Posted 14 May 2005

Schneebergerhof Repower
Location: RP
Operator:
juwi GmbH
Configuration: 1 X 1.5 MW E66, 3 X 1.8 MW E66, 1 X 2 MW V80
Operation: 2004
WTG supplier: Enercon, Vestas
Quick facts: This was one of the first repowering jobs in Germany.  A partially dismantled 600-kW WTG is seen to the left.

Photograph courtesy of juwi GmbH
Posted 9 Nov 2004

Wetteingen
Location: NW
Operator: Global Wind Power A/S
Configuration: 4 X 2-MW V80
Operation: 2003
WTG supplier: Vestas

Photograph courtesy of Global Wind Power A/S
Posted 5 Feb 2006

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 10/06/07

Home