Wind Power Plants in Germany - other länder
Bremerhaven
Location: HB
Operator: PROKON Nord Energiesysteme GmbH
Configuration: 1 X 5 MW M5000
Operation: 2004
WTG supplier: Multibrid
Quick facts: This was the first prototype of the 5-MW Multibrid machine designed specifically for offshore applications. The integrated design includes a single- stage planetary gearbox as well as a permanent magnet generator. This gives a very low top-head weight for such a large wind turbine.

Photograph courtesy of Multibrid Entwicklungsgesellschaft mbH
Posted 10 Jun 2006

Eisenach-II
Location: TH
Operator: EnBw Energie Baden-Wurttemberg AG
Configuration: 6 X 2.0-MW V90
Operation: 2009
WTG supplier: Vestas
EPC: Vortex Energy

Photograph by Weltenangler © and courtesy of EnBw
Posted 22 Jul 2015

Eurogate Bremerhaven
Location: HB
Operator: Eurogate
Configuration: 1 X 3.4 MW
Operation: 2015
WTG supplier: Senvion
Quick facts: This 150m tall WTG was installed at Eurogate's Bremerhaven container terminal complex. Expected production is 9 GWh/yr.

Photograph courtesy of Eurogate
Posted 8 Feb 2015

Haupersweiler
Location: SL
Operator: EnBw Energie Baden-Wurttemberg AG
Configuration: 6 X 2.5-MW N90
Operation: 2009
WTG supplier: Nordex
EPC: Abo Wind
Quick facts: Online in Dec 2010

Photograph by Weltenangler © and courtesy of EnBw
Posted 22 Jul 2015

Hausbay
Location: RP
Operator: KS Regenerative Energie GmbH & Co KG
Configuration: 1 X 3.3-MW N131
Operation: 2016
WTG supplier: Nordex
EPC: Nordex
Quick facts: This installation in Jan 2016 was the world’s tallest wind turbine to date. With a hub height of 164m and a rotor length of 65.5m metres, the WTG reaches a total height of just under 230m. The hybrid tower is made of a 100m concrete tower and two tubular steel tower segments.

Photograph courtesy of Nordex
Posted 29 Jun 2016

Hocheifel
Location: RP
Operator: Windpark Hocheifel
Configuration: 10 X 1-MW D6
Operation: 2000
WTG supplier: DeWind

Photograph courtesy of Umweltkontor AG
Posted 28 Apr 2004

Holzhausen
Location: HE
Operator: WestWind Verwaltungs GmbH & Co KG
Configuration: 15 X 2.0-MW E70/E4
Operation: 2005
WTG supplier: Enercon

Photograph courtesy of WestWind
Posted 28 May 2007

Ochtrup
Location: NW
Operator: Global Wind Power A/S
Configuration: 2 X 2-MW V80
Operation: 2002
WTG supplier: Vestas

Photograph courtesy of Global Wind Power A/S
Posted 5 Feb 2006

Pollenfeld
Location: BY
Operator: Windpark Pollenfeld KG
Configuration: 2 X 1.5-MW
Operation: 2005
WTG supplier: Vestas

Photograph courtesy of Vestas
Posted 14 May 2005

Schneebergerhof Repower
Location: RP
Operator: juwi GmbH
Configuration: 1 X 1.5 MW E66, 3 X 1.8 MW E66, 1 X 2 MW V80
Operation: 2004
WTG supplier: Enercon, Vestas
Quick facts: This was one of the first repowering jobs in Germany. A partially dismantled 600-kW WTG is seen to the left.

Photograph courtesy of juwi GmbH
Posted 9 Nov 2004

Titz-Nord
Location: NW
Operator: RWE Innogy
Configuration: 10 X 2.05-MW MM92
Operation: 2012
WTG supplier: RePower
Quick facts: This project was commissioned in Sep 2012. The site comprises reclaimed land that was part of RWE's Garzweiler open-cast lignite mine. Expected annual production is 55 GWh/yr. The project was developed with BMR Windenergie of Hückelhoven.

Photograph courtesy of RWE Posted 14 Nov 2012

Wangenheim/Hochheim
Location: TH
Operator: Thüga Erneuerbare Energien GmbH & Co KG
Configuration: 4 X 2-MW V90, 1 X 2-MW E-82
Operation: 2012
WTG supplier: Vestas, Enercon

Photograph courtesy of Thüga Erneuerbare Energien GmbH & Co KG
Posted 16 Dec 2012

 
Wetteingen
Location: NW
Operator: Global Wind Power A/S
Configuration: 4 X 2-MW V80
Operation: 2003
WTG supplier: Vestas

Photograph courtesy of Global Wind Power A/S
Posted 5 Feb 2006

Wirfus
Location: RP
Operator: Ibderdrola
Configuration: 5 X 2-MW G80
Operation: 2006
WTG supplier: Gamesa
EPC: Gamesa
Quick facts: In Landkreis Cochem-Zell.

Photograph courtesy of Iberdrola
Posted 9 Jun 2013

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 03-Sep-2016

Home