Central Plains
Location: KS
Operator: Westar Energy
Configuration: 33 X 3-MW V90
Operation: 2009
T/G supplier: Vestas
EPC: RES America
Quick facts: This WPP is on 6,000ac in Wichita County, between Leoti and Scott City. Ground-breaking was in early 2008.

Photograph courtesy of Westar Energy
Posted 31 Aug 2014

Elk River
Location: KS
Operator: PPM Energy Inc
Configuration: 100 X 1.5-MW
Operation: 2005
T/G supplier: GE
Quick facts: This wind farm was developed by HMH Energy Resources and Greenlight Energy Inc and sold to PPM Energy. In Dec 2004, Empire District Electric said it would buy all the plant output.

Photograph courtesy of ScottishPower
Posted 20 Dec 2006

Gray County
Location: KS
Operator: NextEra Energy
Configuration: 170 X 660-kW V47
Operation: 2001
T/G supplier: Vestas

Photograph by Graham K Johnson and courtesy of UtiliCorp United
Posted 6 Jan 2002

Flat Ridge
Location: KS
Operator: Westar Energy
Configuration: 40 X 2.5-MW C96
Operation: 2009
T/G supplier: Clipper
EPC: WindConnect
Quick facts: This project in Barber Co was a 50:50 joint development of Westar and BP Alternative Energy. Ground-breaking was in Jul 2008 and the plant was opened on 6 Mar 2009.

Photograph courtesy of Westar Energy
Posted 4 Apr 2009

Ironwood WInd
Location: KS
Operator: Duke Energy Renewables
Configuration: 73 X 2.3-MW SWT-2.3-101
Operation: 2012
T/G supplier: Siemens
Quick facts: This WPP has a 7,450ac site in Ford and Hodgeman counties. Ground-breaking was in Q4, 2011 and the project commissioned in Oct 2012. Duke has a 20yr PPA with Westar for Ironwood's production. A 50% stake in the plant is owned by Sumitomo Corp.

Photograph courtesy of Westar Energy
Posted 1 Sep 2014

Meridian Way
Location: KS
Operator: EDP Renewables North America LLC.
Configuration: 67 X 3-MW V90
Operation: 2008
T/G supplier: Vestas
EPC: Michels Wind Energy
Quick facts: This WPP has a 1,200ac site in Cloud Co in north-central Kansas. The site is at an average elevation of 1,650ft.

Photograph courtesy of Westar Energy
Posted 1 Sep 2014

 
Post Rock
Location: KS
Operator: Wind Capital Group
Configuration: 134 X 1.5-MW XLE
Operation: 2012
T/G supplier: GE
EPC: RMT
Quick facts: Post Rock was built on 11,000ac in Ellsworth and Lincoln counties. Groundbreaking was on 5 Sep 2011 and the project was commissioned in Oc 2012. The power offtatker is Westar Energy.

Photograph courtesy of GE Global Energy Services
Posted 31 Aug 2014

Smoky Hills
Location: KS
Operator: Enel North America
Configuration: 56 X 1.8-MW V80, 99 X 1.5 MW SL
Operation: 2008
T/G supplier: Vestas, GE
Quick facts: This wind plant is on 12,500ac in central Kansas. Construction began in Jun 2007 after 4yrs of planning with landowners and local authorities. The plant was built in two phases and inaugurated in Oct 2008. It was developed by TradeWind Energy. Output is sold to Kansas Board of Public Utilities, Midwest Energy, and Sunflower Electric Coop, and the cities of Independence and Springfield, Missouri. The wind park is connected to a nearby 230kV line.

Photograph courtesy of Enel
Posted 19 Nov 2008