Dongguan Kewei
Location: Guangdong
Operator: GCL-Poly Energy Holdings Ltd
Configuration: 2 X 15 MW, 1 X 12 MW CHP
Fuel: refuse, coal
Operation: 2007-2008
Boiler/incinerator supplier: ??
T/G supplier: ??
Quick facts: Dongguan Kewei burns MSW from Hengli Town and other districts of Dongguan City. Daily throughput is
1,200t. China Power New Energy Development Co Ltd has a 40% stake in the facility.
Photograph courtesy of GCL-Poly Energy Holdings Ltd
Posted 4 Jul 2010 |
Gaoantun
Location: Beijing
Operator: Golden State Environment Corp
Configuration: 1 X 25 MW CHP
Operation: 2008
Fuel: refuse
Boiler/incinerator supplier: Takuma
T/G supplier: ??
EPC: Takuma
Quick facts: This is the first WTE plant in Beijing. Development started
in May 2003 and the project cost Rmb 820mn. There are two 800 tpd
lines. The plant was completed in Jul 2008, not long before the opening of
the 2008 Olympic Games.
Photograph courtesy of Golden State Environment
Posted 15 Nov 2009 |
Hebei Lingda
Location: Fujian
Operator: Hebei Lingda Environment-Friendly Energy Co Ltd
Configuration: 2 X 12 MW
Operation: 2006
Fuel: refuse
Boiler/incinerator supplier: ??
T/G supplier: ??
Quick facts: This plant in Shijiazhuang City was the first WTE palnt in
Hebei and is owned by Hebei Construction & Investment Group. The units
were put into production in 6 Jan 2006 at a cost of Rmb 2.6bn. Two CFB
boilers burn 800-1,000 tpd of MSW.
Photograph courtesy of Hebei Construction & Investment
Posted 14 Aug 2011 |
|
Hongmiaoling
Location: Fujian
Operator: Chongqing Sanfeng Covanta Environmental Industry Co Ltd
Configuration: 24 MW
Operation: 2007
Fuel: refuse Boiler/incinerator supplier: ??
T/G supplier: ??
EPC: Chongqing Iron & Steel
Quick facts: This BOT project went commercial in Aug 2007. Throughput is
1,200 tpd of MSW. It is the largest WTE plant in Fujian and is permitted
for 27yrs of operation.
Photograph courtesy of Chongqing Sanfeng Covanta Environmental Industry Co Ltd
Posted 27 Sep 2008 |
Nanshan
Location: Guangdong
Operator: Shenzhen Energy Environmental Engineering Co Ltd
Configuration: 1 X 12 MW
Operation: 2004
Fuel: refuse Boiler/incinerator supplier: Seghers
T/G supplier: Dongfang
Quick facts: Nanshan is a two-line, 800 tpd WTE plant
equipped with lime-based rotary atomizers and activated carbon injection
systems for emissions control.
Photograph courtesy of Seghers Keppel Technology
Posted 27 Oct 2004 |
Shenzhen Baoan
Location: Guangdong
Operator: Shenzhen Energy Group Co Ltd
Configuration: 2 X 30 MW CHP
Fuel: refuse
Operation: 2005
Boiler/incinerator supplier: Seghers, China Western Power
T/G supplier: ??
Quick facts: This was the largest WTE plant in China when it started
operation in Dec 2005. It cost Rmb538mn and took 2yrs to build. Senzhen's
Baoshan district produces about 3,000 tpd of MSW.
Photograph courtesy of China Western Power Co
Posted 9 Jan 2011 |
|
|
Tongxing
Location: Chongqing
Operator: Chongqing Sanfeng Covanta Environmental Industry Co
Configuration: 2 X 12 MW
Operation: 2005
Fuel: refuse
Boiler/incinerator supplier: Martin, Chongqing Iron & Steel
T/G supplier: ??
EPC: Chongqing Iron & Steel
Quick facts: Tongxing is the first modern WTE plant in southwestern China.
It was also the first BOT WTE plant and the first using domestically
supplied grates. It went online on 28 Mar 2005 and throughput is 1,200 tpd
of MSW.
Photograph courtesy of Chongqing Sanfeng Covanta Environmental Industry Co
Posted 27 Sep 2008 |
|