Böblingen
Location: BW
Operator: Zweckverband Restmüllheizkraftwerk Böblingen
Configuration: 1 X 12 MW CHP
Operation: 1999
Fuel: refuse
Boiler/incinerator system supplier: Steinmuller
T/G supplier: ABB
EPC: Goepfert Reimer and Partner
Quick facts: The facility is jointly-owned by
four municipalities: Landkreis Böblingen, Landkreis Calw, Landkreis
Freudenstadt, and Stadt Stuttgart. Back-end equipment includes
baghouses, a calcium hydroxide scrubber, and SCR. Throughput is about 140,000 tons MSW/yr.
Photograph courtesy of Zweckverband RBB
Posted 2 Dec 2006 |
TREA Breisgau
Location: BW
Operator: Gesellschaft Abfallwirtschaft Breisgau mbH
Configuration: 1 X 15 MW CHP
Operation: 2005
Fuel: refuse
Boiler/incinerator system supplier: Von Roll
T/G supplier: Siemens
EPC: E.ON Energy from Waste
Quick facts: The plant cost about €83mn. Partners include Badenova, GAB, STEAG, and SOTEC.
Back-end equipment includes ESPs, baghouses, a wet
scrubber, and SCR. Throughput is about 150,000 tons MSW/yr.
Photograph courtesy of SOTEC GmbH
Posted 29 Oct 2005 |
MPA Burgau
Location: BW
Operator: Müllpyrolyseanlage Burgau
Configuration: 1 X 2.2 MW CHP
Operation: 1984
Fuel: refuse
Boiler/incinerator system supplier: ??
T/G supplier: ??
EPC: WasteGen UK Ltd
Quick facts: MPA Burgau is one of the early and more suscessfule waste pyrolysis power
stations in the world. The plant is about 3km from the city of Burgau and can process about 34,000 tpy/yr of sold was from
the Gunzurg region. The facility has two rotary kilns, dust treatment, a combustion chamber for the syngas, an HRSG and steam T/G set,
and bicarb and activiated caboun injection with baghouse capture.
Photograph courtesy of Bayerisches Landesamt für Umwelt
Posted 25 Aug 2010 |
|
IGS Gersthofen
Location: BW
Operator: MVV Energiedienstleistungen
Configuration: 1 X 4.4 MW CHP
Operation: 2009
Fuel: RDF
Boiler/incinerator system supplier: Wulff
T/G supplier: M&M, LS
Quick facts: This €30mn CHP plant was commissioned on 20 July 2009. Steam and electricity are supplied to 12 companies at
Industriepark Gersthofen.
Photograph courtesy of MVV
Posted 30 Oct 2010
|
|
MHKW Göppingen
Location: BW
Operator: E.ON Energy from Waste
Configuration: 1 X 12 MW CHP
Operation: 1975-2009
Fuel: refuse
Boiler supplier: Deutsche Babcock
T/G supplier: Kanis
EPC: Deutsche Babcock, E.ON Engineering
Quick Facts: The original 9.5-MW set at Göppingen was put online in
1975. The turbine was changed out in 2009.
District heating is supplied to Klinik am Eichert, the Berfeld
residential area and the nearby police academy and administrative facility.
Photograph courtesy of E.ON Energy from Waste
Posted 6 Mar 2011 |