WTE Plants in Germany -
Hamburg, Niedersachsen & Schleswig-Holstein
Borsigstraße
Location: HH
Operator: Vattenfall Europe Waste-to-Energy GmbH
Configuration: 3 X 6.4 MW, 1 X 20 MW CHP
Operation: 1963-2005
Fuel: refuse, wood
Boiler/incinerator system supplier: Von Roll, FW
T/G supplier: MAN Turbo
EPC: Prokon
Quick facts: Throughput is about 320,000t MSW/yr. This plant was used to pilot the use of ChlorOut, a sulphate-containing group of additives used to reduce corrosive alkali chlorides in WTE plant flue gases. Unit-4 cost about €45mn and has a CFB boiler that can burn wood waste, flotsam, and other biomass.

Photograph courtesy of Vattenfall Europe
Posted 31 Jul 2008

Enertec Hameln
Location: NI
Operator: Interargem GmbH
Configuration: 1 X 15.5 MW, 1 X 19 MW CHP
Operation: 2002-2009
Fuel: refuse, waste wood
Boiler/incinerator system supplier: Enprima
T/G supplier: ABBT
EPC: Enprima, Envicon, Ingenieurbüro Mönkemeier
Quick facts: The Enertec Hameln plant burns about 300,000 tpy of MSW and 100,000 tpy of waste wood. It was built at the site of the Afferde power station and the first WTE unit was one of the old coal-fired sets repowered. Electricity is sold into the system of E.ON Westfalen Weser AG and steam is used by local commercial and residential customers. Interargem GmbH is a JV of EEW Energy from Waste GmbH (61.2%), Stadtwerke Bielfeld (35.7%), and regional muncipalities (3.1%). A fourth line was added in 2009.

Photograph courtesy of E.ON Energy from Waste AG
Posted 7 Jul 2013

EVI-Europark
Location: NI
Operator: EVI Abfallverwertung BV & Co
Configuration: 1 X 60 MW CHP
Operation: 2008
Fuel: refuse
Boiler/incinerator system supplier: Visser & Smit Hanab
T/G supplier: Skoda
EPC: Prokon
Quick facts: This is a unique power station located on the border between the Nehterlands and Germany. The incinerator is on the German side and the power house is on the Dutch side. High pressure steam lines cross the frontier. The two-line plant has design throughput of 360,000 tpy of MSW.

Photograph courtesy of Visser & Smit Hanab
Posted 16 Jan 2013

MVA Hannover
Location: NI
Operator: EEW Energy from Waste GmbH
Configuration: 1 X 27 MW CHP
Operation: 2005
Fuel: refuse
Boiler/incinerator system supplier: ??
T/G supplier: Alstom
Quick facts: Throughput is about 280,000t MSW/yr. The plant cost about €100mn.

Photograph courtesy of BKB AG
Posted 6 May 2006

Helmstedt
Location: NI
Operator: EEW Energy from Waste GmbH
Configuration: 1 X 30 MW CHP
Operation: 1998
Fuel: refuse
Boiler/incinerator system supplier: ??
T/G supplier: ??
Quick facts: The 3-line Helmstedt WTE plant was built at the site of the BKB Buschhaus lignite power station. The plant was extended in 2005.

Photograph courtesy of E.ON Energy from Waste AG
Posted 7 Jul 2013

AHKW Neunkirchen
Location: NI
Operator: Operator: EEW Energy from Waste GmbH
Configuration: 2 X 6 MW CHP
Operation: 1998
Fuel: refuse
Boiler/incinerator system supplier: Ansaldo
T/G supplier: Ansaldo, Tosi
Quick facts: This plant has two treatment lines, each with a capacity of 8.5 tph of MSW. Back-end equipment includes ESPs, baghouses, a wet scrubber, and oxidation catalysts.

Photograph courtesy of STEAG AG
Posted 23 Oct 2005

Rugenburger Damm
Location: HH
Operator: Mullverwertung Rugenberger Damm
Configuration: 1 X 29 MW
Operation: 1999
Fuel: refuse
Boiler/incinerator system supplier: BBP
T/G supplier: GHH, Alstom
EPC: Electrowatt
Quick Facts: MVR has district-heating capacity and is the second of Hamburg's two modern WTE plants.

Photograph by Manfred Schulze-Alex and courtesy of MVR Mullverwertung Rugenberger Damm
Posted 1 Aug 2002

Stapelfeld Rebuild
Location: SH
Operator: EEW Energy from Waste GmbH
Configuration: 1 X 20 MW CHP
Operation: 1997
Fuel: refuse
Boiler/incinerator system supplier: Alstom
T/G supplier: Alstom
EPC: Alstom
Quick facts: MVA Stapelfeld GmbH was formed in 1973 by local authorities to build an incinerator at this site east of Hamburg. The facility came online in 1979 and was rebuilt in 1997. It became part of EEW in 2003. MSW throughput is 350,000 tpy.

Photograph courtesy of E.ON Energy from Waste AG
Posted 7 Jul 2013

MVA Stellinger Moor Damm
Location: HH
Operator: Stadtreinigung Hamburg
Configuration: 2 X 11 MW CHP
Operation: 1973
Fuel: refuse
Boiler/incinerator system supplier: Martin, Walther
T/G supplier: AEG
Quick Facts: There is only sufficient steam generated to drive one steam set at a time.

Photograph by courtesy of Stadtreinigung Hamburg
Posted 14 Jan 2006

Weener
Location: NI
Operator: Weener Energie GmbH & Co KG
Configuration: 2 X 4.6 MW CHP
Operation: 2008
Fuel: RDF, paper mill waste
Boiler/incinerator system supplier: Baumgarte
T/G supplier: Siemens
EPC: Ingenieurbüro Kaiser, Cegelec
Quick Facts: This plant supplies steam for paper drying at the Klingele Papierwerke mill via a 1.8km pipeline. Fuel burn is about 140,000 tpy. The plant is operated by N.prior energy.

Photograph by Sarah Schäfer (wikimedia)
Posted 18 Feb 2011