Borsigstraße
Location: HH
Operator: Vattenfall Europe Waste-to-Energy GmbH
Configuration: 3 X 6.4 MW, 1 X 20 MW CHP
Operation: 1963-2005
Fuel: refuse, wood
Boiler/incinerator system supplier: Von Roll, FW
T/G supplier: MAN Turbo
EPC: Prokon
Quick facts: Throughput is about 320,000t MSW/yr. This plant was used to
pilot the use of ChlorOut, a sulphate-containing group of additives used
to reduce corrosive alkali chlorides in WTE plant flue gases. Unit-4
cost about €45mn and has a CFB boiler that can burn wood waste, flotsam,
and other biomass.
Photograph courtesy of
Vattenfall Europe
Posted 31 Jul 20086 May 2006 |
BKB Hannover
Location: NI
Operator: BKB AG
Configuration: 1 X 27 MW CHP
Operation: 2005
Fuel: refuse
Boiler/incinerator system supplier: ??
T/G supplier: Alstom
Quick facts: Throughput is about 280,000t MSW/yr. The plant cost
about
€100mn.
Photograph courtesy of BKB
AG
Posted 6 May 2006 |
AHKW Neunkirchen
Location: NI
Operator: SOTEC GmbH
Configuration: 2 X 6 MW CHP
Operation: 1998
Fuel: refuse
Boiler/incinerator system supplier: Ansaldo
T/G supplier: Ansaldo, Tosi
Quick facts: This plant has two treatment lines, each with a capacity of
8.5 tph of MSW. Back-end equipment includes ESPs, baghouses, a wet
scrubber, and oxidation catalysts.
Photograph courtesy of STEAG
AG
Posted 23 Oct 2005 |
|
MHKW Pirmasens
Location: NI
Operator: SOTEC GmbH
Configuration: 16 MW CHP
Operation: 1998
Fuel: refuse
Boiler/incinerator system supplier: ??
T/G supplier: ??
Quick facts: This plant has two treatment lines, each with a capacity of
12 tph of MSW. Back-end equipment includes ESPs, baghouses, a wet
scrubber, and oxidation catalysts.
Photograph courtesy of STEAG AG
Posted 23 Oct 2005 |
Rugenburger Damm
Location: HH
Operator: Mullverwertung Rugenberger Damm
Configuration: 1 X 29 MW
Operation: 1999
Fuel: refuse
Boiler/incinerator system supplier: BBP
T/G supplier: GHH, Alstom
EPC: Electrowatt
Quick Facts: MVR has district-heating capacity and is the second of
Hamburg's two modern WTE plants.
Photograph by Manfred Schulze-Alex and courtesy of MVR Mullverwertung Rugenberger Damm
Posted 1 Aug 2002 |
MVA Stellinger Moor Damm
Location: HH
Operator: Stadtreinigung Hamburg
Configuration: 2 X 11 MW CHP
Operation: 1973
Fuel: refuse
Boiler/incinerator system supplier: Martin, Walther
T/G supplier: AEG
Quick Facts: There is only sufficient steam generated to drive one steam
set at a time.
Photograph by courtesy of Stadtreinigung Hamburg
Posted 14 Jan 2006 |
|
|
Weener
Location: NI
Operator: Weener Energie GmbH & Co KG
Configuration: 2 X 4.6 MW CHP
Operation: 2008
Fuel: RDF, paper mill waste
Boiler/incinerator system supplier: Baumgarte
T/G supplier: Siemens
EPC: Ingenieurbüro Kaiser, Cegelec
Quick Facts: This plant supplies steam for paper drying at the Klingele
Papierwerke mill via a 1.8km pipeline. Fuel burn is about 140,000 tpy. The plant is operated by N.prior
energy.
Photograph by Sarah Schäfer (wikimedia)
Posted 18 Feb 2011 |
|