Waste-to-Energy Plants in Portugal and Spain

La Coruna
Location: Spain
Operator: Soc Galega do Medio Ambientehas
Configuration: 1 X 49 MW
Operation: 1999
Fuel: refuse
Boiler/incinerator system supplier: Kvaerner
T/G supplier: Skoda
Quick Facts: The WTE plant is the centerpiece of a large integrated waste treatment and waste disposal complex in Galicia and features a BFB boiler.

Photograph courtesy of SOGAMA
Posted 12 Apr 2002

Lipor
Location: Portugal Operator: Lipor
Configuration: 1 X 25 MW
Operation: 1999
Fuel: refuse
Boiler/incinerator system supplier: CNIM
T/G supplier: Siemens
EPC: Ramboll
Quick Facts: The Porto region has about 1mn inhabitants and produces about 480,000 tpy of MSW.

Photograph courtesy of Lipor
Posted 14 Jan 2006

Madeira
Location: Portugal Operator: ETRSU Madeira
Configuration: 1 X 8.1 MW
Operation: 2003
Fuel: refuse
Boiler/incinerator system supplier: Lurgi
T/G supplier: ??
Quick Facts: The plant has a semidry scrubber and SNCR.

Photograph courtesy of STEAG
Posted 16 Oct 2005

Mataro
Location: Spain
Operator: Tractament i Revaloritzacio de Residus del Maresme SA (TRM)
Configuration: 1 X 11.6 MW
Operation: 1994
Fuel: refuse
Boiler/incinerator system supplier: ??
T/G supplier: GEC-Alsthom
EPC: Tiru, Sogea
Quick Facts: TRM is a joint venture of Tiru (45%), Acciona (45%), and Endesa (10%). The plant has two grate furnace lines with a design throughput of 160,000 tpy of MSW plus a sorting center that can handle 40,000 tpy, all collected in 26 municipalities of the Maresme region in northeast Catalonia. The plant was upgraded in 2002/03 and has ISO 9002 and ISO 14001 certification.

Photograph courtesy of Groupe Tiru
Posted 7 Apr 2007

Tirmadrid
Location: Spain
Operator: Urbaeneregia SA
Configuration: 1 X 29 MW
Operation: 1996
Fuel: refuse
Boiler/incinerator system supplier: Vulcan Sadeco, Lurgi
T/G supplier: ABB
EPC: Holter, Dragados
Quick Facts: The integrated MSW plant treats 1,200 tpd of which about 500 tpd are incinerated in three identical treatment lines with ROWITEC rotating CFB incinerators. The plant was developed by a JV of Enel Unión Fenosa Renovables and Endesa Cogeneración y Renovables. It is located at Valdemíngomez, Madrid.

Photograph courtesy of Lurgi-Lentjes
Posted 21 Aug 2004

Valorsul
Location: Portugal Operator: Valorsul SA
Configuration: 1 X 50 MW
Operation: 1999
Fuel: refuse
Boiler/incinerator system supplier: FW
T/G supplier: Dresser, Jeumont
EPC: FW
Quick Facts: The plant has three trains and capacity is 2,000mt/day of MSW. Emissions controls include a baghouse and semidry scrubber from ABB plus SNCR. Contract was awarded in Nov 1995.

Photograph courtesy of Valorsul SA
Posted 20 Oct 2005

 

Abbreviations

Data: industcards, Platts UDI World Electric Power Plants Data Base

Updated 21-Jan-2013