Arezzo
Location: AR
Operator: AISA SpA
Configuration: 1 X 2.9 MW CHP
Operation: 2004
Fuel: refuse
Boiler/incinerator system
supplier: ??
T/G supplier: ??
Quick Facts: This WTE plant is licensed to incinerate 175,000 tpy.
Photograph courtesy of
AISA SpA
Posted 8 Nov 2006 |
Bergamo
Location: BS
Operator: A2A SpA
Configuration: 1 X 10.7 MW CHP
Operation: 1988
Fuel: refuse
Boiler/incinerator system supplier: Energy Products of Idaho, CCT
T/G supplier: ??
Quick facts: This plant was modernized in 2003 and the original T/G set
changed out for a new machine twice the size.
Photograph courtesy of
A2A SpA
Posted 8 Aug 2009 |
Brescia
Location: BS
Operator: A2A SpA
Configuration: 1 X 75 MW CHP
Operation: 1998
Fuel: refuse, biomass
Boiler/incinerator system supplier: Martin, Ansaldo
T/G supplier: Ansaldo, ABB
EPC: Ansaldo, Martin, SAE Sadelmi
Quick facts: This plant has two MSW lines and a dedicated biomass
combustion unit added in 2004. About 50% of the total investment was put
into APC equipment. In 2008, combined MSW and biomass burn amounted to
801,000t with production of 570 MWh of electricity and 568 MWh of heat.
Photograph courtesy of
A2A SpA
Posted 8 Aug 2009 |
 |
 |
 |
|
Brindsisi Polifunz
Location: BR
Operator: Veolia Servizi Ambientali SpA
Configuration: 1 X 1.75 MW
Operation: 2001
Fuel: refuse
Boiler/incinerator system supplier: TME
T/G supplier: ??
Quick Facts: This plant has a single line with a rotary kiln rate at 2.3
tph of MSW. It has a bicarbonate scrubber with activated carbon injection
and a barghouse.
Photograph courtesy of TME Termomeccanica Ecologia
Posted 10 May 2009 |
Caab Pilastro
Location: BO
Operator: Frullo Energia Ambiente Srl
Configuration: 1 X 22 MW CHP
Operation: 2004
Fuel: refuse, biomass
Boiler/incinerator system supplier: TME
T/G supplier: ??
EPC: STI - Studio Tecnico di Ingegneria Srl
Quick Facts: This unit in Granarolo Emila replaces an old WTE unit which operated from
1973-2005. During that time, the plant handled 4.4mn tons of refuse
and produced 554 GWH of electricity and 416 mn mcal of thermal energy. The
new unit was authorized in 2001 and has two identical lines with a total
capacity of 660 tpd It is
expected to produce about 130 GWh/yr as well as heat. The current unit has
a bicarbonate scrubber with activated carbon injection, a barghouse, and
SCR. Frullo Energia is a Hera company.
Photograph courtesy of TME Termomeccanica Ecologia
Re-posted 10 May 2009 |
Cagliari
Location: CA
Operator: Tecnocasic
Configuration: 1 X 9.4 MW, 1 X 4.5
Operation: ?-2003
Fuel: refuse
Boiler/incinerator system supplier: TME
T/G supplier: ??
EPC: TMC
Quick Facts: TME added a third line to an existing plant and the plant has
three stoker furnaces and the new rotary kiln.
Photograph courtesy of TME Termomeccanica Ecologia
Posted 10 May 2009 |
 |
 |
 |
|
Corteolona
Location: PV
Operator: Ecodeco
Configuration: 1 X 9 MW
Operation: 2003
Fuel: refuse
Boiler/incinerator system supplier: KPO
T/G supplier: Tosi
EPC: Siti.Cem Apme SpA
Quick Facts: The Corteolona plant has two 40,000tpa lies feeding a single
CFB boiler. The solid waste handling facilities started operations in
1996.
Photograph courtesy of Ecodeco
Posted 4 Mar 2009 |
Dalmine
Location: RG
Operator: REA Dalmine SpA
Configuration: 1 X 15.6 MW
Operation: 2001
Fuel: refuse
Boiler/incinerator system supplier: ??
T/G supplier: ??
EPC: NoyVallesina Engineering
Quick Facts: REA Dalmine was founded in 1996 by NoyVallesina Engineering and Green Holding joined the venture in 2001. Neutrec supplied the APC equipment for Dalmie
including ESP, sodium bicarbonate scrubber, activated carbon injection,
and SCR.
Photograph courtesy of Neutrec
Posted 7 Mar 2009 |
Gioia Tauro
Location: RC
Operator: Veolia Servizi Ambientali SpA
Configuration: 1 X 17 MW
Operation: 2005
Fuel: refuse
Boiler/incinerator system supplier: TME
T/G supplier: ??
EPC: Impresa Ing Nino Ferrari La Spezia
Quick Facts: Development of this plant started in 1998 when authorities
tendered for a new, privately-owned WTE plant for Southern Calabria. The
TEC SpA (Termo Energia Calabria) scheme includes the incinerator and five regional
collection sites in Reggio Calabria, Gioia Tauro, Siderno, Crotone e
Rossano Calabro, giving a total nominal throughtput of 411,000 tpy of of
MSW, of which 120,000 tpy is used in the WTE plant. Two lines were built, the first completing in 2004 and the second
the following year.
Photograph courtesy of TME Termomeccanica Ecologia
Posted 24 May 2009 |
 |
 |
 |
|
Lomellina (Parona)
Location: PV
Operator: Linea Holding
Configuration: 1 X 16 MW, 1 X 19 MW
Operation: 2000-2007
Fuel: refuse
Boiler/incinerator system
supplier: FW
T/G supplier: Ansaldo
Quick Facts: Foster Wheeler developed the project and built the CFB
boiler for the 200,000 tpy plant. Lomellina has a dry
scrubber using lime and activated carbon injection followed by a baghouse.
In Jan 2001, FW sold a 50% stake in the operating company to a subsidiary
of Merloni Group and in 2005, Cogeme (Linea Group) purchased a 51% stake
in the operating company. A second, similarly-sized line was opened in
2007 at a cost of about €150mn. Photograph courtesy of
Foster Wheeler Italiana
Posted 4 Nov 2001 |
Macomer
Location: CA
Operator: Ferrero SpA
Configuration: 1 X 2 MW
Operation: 1994
Fuel: refuse, hospital waste
Boiler/incinerator system
supplier: Lurgi
T/G supplier: ??
EPC: Lurgi, TME
Quick Facts: This plant has a ROWITEC rotating CFB incinerator.
Photograph courtesy of Lurgi-Lentjes
Posted 21 Aug 2004 |
Massafra
Location: TA
Operator: EuroEnergy Group Srl
Configuration: 1 X 3.5
Operation: 2000
Fuel: refuse
Boiler/incinerator system supplier: TME
T/G supplier: ??
Photograph courtesy of TME Termomeccanica Ecologia
Posted 24 May 2009 |
 |
 |
 |
|
Pietrasanta
Location: LU
Operator: Veolia Servizi Ambientali SpA
Configuration: 1 X 6.3 MW
Operation: 2002
Fuel: refuse
Boiler/incinerator system supplier: TME
T/G supplier: Ansaldo
Quick Facts: The Pietrasanta plant (also known as Falascaia) has two lines
with CFB boilers along with dry and wet APC equipment. The plant was
authorized by regional authorities to replace a facility that was built in
the 1970s and closed about 10yrs later.
Photograph courtesy of TME Termomeccanica Ecologia
Posted 24 May 2009 |
Potenza
Location: PZ
Operator: Veolia Servizi Ambientali SpA
Configuration: 1 X 1.2 MW
Operation: 2002
Fuel: refuse
Boiler/incinerator system supplier: TME
T/G supplier: ??
Quick Facts: This small WTE plant has two stoker-based combustion
lines.
Photograph courtesy of TME Termomeccanica Ecologia
Posted 24 May 2009 |
San Rocco
Location: CR
Operator: Linea Holding
Configuration: 1 X 2.6 MW, 1 X 4 MW CHP
Operation: 1997-2001
Fuel: refuse
Boiler/incinerator system supplier: Aster
T/G supplier: Fincantier, KKK, Tosi, Leroy Somer
Quick Facts: This plant is located about 2km southeast of the city center
in via Antichi Budri, Cremona. Thermal output is about 12 MWt. The plant disposed of about 60,000t
of refuse in 2007.
Photograph courtesy of Linea
Holding
Posted 10 May 2009 |
 |
 |
 |
|
Silea Lecco
Location: LC
Operator: Silea SpA
Configuration: 1 X 14 MW
Operation: 2006
Fuel: refuse
Boiler/incinerator system supplier: TME, Sices
T/G supplier: Tosi, Marelli
EPC: TME
Quick Facts: Società Intercomunale Lecchese per l'Ecologia e
l'Ambiente per Azioni (Silea) was formed in
1995 as a municipal waste company per agreements dating
to 1972. The plant is in Valmadrera. In 2006, a second waste treatment line and
steam T/G set was added. The boiler system has urea injection, a baghouse, sodium bicarbonate
scrubber with activated carbon injection, a wet scrubber, and an
air-cooled condenser. In 2007, the plant consumed 65,000t of refuse and produced 37 GWh of electric power.
Photograph courtesy of Silea
SpA
Posted 14 Mar 2009 |
Tecnoborgo (Piacenza)
Location: PC
Operator: Tecnoborgo SpA
Configuration: 1 X 11.63 MW
Operation: 2002
Fuel: refuse
Boiler/incinerator system supplier: CNIM, Martin
T/G supplier: Alstom
EPC: CNIM
Quick Facts: This plant has two lines equipped with ESPs and fabric
filters, carbon injection, and sodium bicarbonate injection. Total
throughput is about 120,000 tpy and about 65 GWh of electricity is sold
into the grid. The plant is a joint venture of Veolia and Enia SpA.
Photograph courtesy of Regione Emilia-Romagna
Posted 22 Aug 2007 |
Trezzo sull'Adda
Location: MI
Operator: Actelios SpA
Configuration: 1 X 18 MW
Operation: 2002
Fuel: refuse
Boiler/incinerator system supplier: Von
Roll
T/G supplier: Tosi
EPC: Protecma srl
Quick facts: The project is designed to manage up to 500 mtpd of
pre-sorted municipal refuse. The plant is owned by Falck and Covanta
Energy from the U.S., which has a 13% equity share. Power is sold to Enel.
Photograph courtesy of
Gruppo Falck
Posted 8 Jun 2005 |
|
|
 |
|
|
|
Vercelli
Location: VC
Operator: Veolia Servizi Ambientali SpA
Configuration: 1 X 3.5 MW
Operation: 1997
Fuel: refuse
Boiler/incinerator system supplier: TME
T/G supplier: ??
Quick Facts: The first Vercelli WTE plan was built in 1977. In 1992, TMN
was awarded a contract to renovate the plant and add a third line.
Photograph courtesy of TME Termomeccanica Ecologia
Posted 24 May 2009 |
|
 |