Waste-to-Energy Plants in Switzerland - Aargau & Zurich
KVA Buchs
Location: Aargau
Operator: KVA Buchs AG
Configuration: 1 X 11 MW CHP
Operation: 1995
Fuel: refuse
Boiler/incinerator system supplier: Martin, Wehrle-Werk AG
T/G supplier: ABB
EPC: Enertech
Quick Facts: Steam is supplied to Fernwärme Wynenfeld AG (Fewag) for district heating.

Photograph courtesy of KVA Buchs
Posted 4 May 2005

Dietikon
Location: Zurich
Operator: Limeco
Configuration: 1 X 9.6 MW CHP
Operation: 1993
Fuel: refuse
Boiler/incinerator system supplier: Enertech
T/G supplier: ABB
EPC: Caliqua
Quick facts: This intercommunal water treatment and waste handling company was formed in 1959 by eight municipalities, Dietikon, Geroldswil, Oberengstringen, Oetwil a d L, Schlieren, Unterengstringen, Urdorf, and Weiningen. The WTE plant was started up in 1993 and a second line was added in 1995.

Photograph courtesy of Zurcher Abfallverwertungs AG
Posted 11 Jun 2016

Hagneholz
Location: Zurich
Operator: ERZ Entsorgung + Recycling Zurich
Configuration: 1 X 19.5 MW CHP
Operation: 2006
Fuel: refuse, wastewate sludge
Boiler/incinerator system supplier: Enertech
T/G supplier: B+V, Elin
EPC: Caliqua
Quick facts: This operation is owned by Stadt Zurich and supplies Zurich-Nord and the university district with heat and waste services. 5-MW T/G sets were buil in 1973 and 1982, these are now retired. The WTE plant and associated infrastructure was updated in a CHF 235mn project completing in 2010. Throughput is about 240,000 tpy of MSW plus around 30,000 tpy of wastewate sludge.

Photograph courtesy of Zurcher Abfallverwertungs AG
Posted 11 Jun 2016

Hinwil
Location: Zurich
Operator: Kehrichtverwertung Zurcher Oberland (KEZO)
Configuration: 1 X 10.2 MW, 1 X 10.6 MW CHP
Operation: 1970-1996
Fuel: refuse
Boiler/incinerator system supplier: Enertech
T/G supplier: ABB, AEG
Quick facts: KEZO started up in 1963 with its first waste handling facility. A 13-MW generating unit was built in 1970 and a second unit was added in 1976. The furnaces were replaced and refurbished in 1996 and 2000, respectively, and the APC plant was replaced in 2012. In 1996, a third incineration line was added and the first T/G set was replaced. In 2009, a greenhouse was built by Gebruder Meier to use the waste heat and a second larger facility was built in 2014 by Beerstecher AG.

Photograph courtesy of Kehrichtverwertung Zurcher Oberland
Posted 11 Jun 2016

Horgen
Location: Zurich
Operator: Zweckverband fur Abfallverwertung im Bezirk Horgen
Configuration: 1 X 3 MW CHP
Operation: 2016
Fuel: refuse, biomass
Boiler/incinerator system supplier: HZI
T/G supplier: Depretto
EPC: HZI
Quick facts: TKVA horgen was found in 1964 and today serves about 100,000 people. The 2-line plant was rebuilt in 2015/16 with new APC equipment, a new T/G set, and incresed heating output. The original line was taken out of service. Throughput is about 65,000 tpy of MSW and biomass.

Photograph courtesy of Zweckverband fur Abfallverwertung im Bezirk Horgen
Posted 11 Jun 2016

Turgi
Location: Aargau
Operator: KVA Turgi
Configuration: 1 X 5.2 MW, 1 X 7.7 MW CHP
Operation: 1970-1998
Fuel: refuse
Boiler/incinerator system supplier: Enertech
T/G supplier: ABB
Quick facts: This WTE serves 69 member communities with about 218,000 inhabitants. Throughput in 2015 was 124,400mt. of MSW.

Photograph courtesy of KVA Turgi
Re-posted 3 Jul 2016

   
KVA Winterthur
Location: Zurich
Operator: Stadtwerk Winterthur
Configuration: 1 X 8.5 MW (ret), 1 X 6.3 MW, 1 X 25 MW
Operation: 1978-2013
Fuel: refuse
Boiler/incinerator system supplier: Enertec, Martin
T/G supplier: BBC, B+VDDIT
EPC: Caliqua
Quick facts: In Mar 2007, voters approved a CHF 187mn project to replace the first unit at the Stadtwerk Winterthur WTE plant. Work got underway in Sep 2008 and commissioning of the new line began in Feb 2012. The new 24-MW unit is expected in full operation by the end of 2013 at a total cost of about CNF 214mn.

Photograph courtesy of Kanton Zurich
Posted 4 Nov 2013